4 Planning and installation – Installing the heating system
50
4. Set the position indicator (1) for the pressure equalisation regu-
lator to approximately “Half open” using a 5 mm hexagon socket
screw.
5. Fit the servo motor cover.
✓
The pressure equalisation regulator is set.
I
NSTALLING
ASH
CONTAINER
(
S
)
A
SH
CONTAINER
80
L
1. Remove the ash containers from the packaging.
2. Lift up the two clamp handles (1, 3).
3. Insert the ash containers (2) on the ash removal pipe.
4. Press the clamp handles downward.
✓
Grasp the clamp handles and press the ash containers against the
seal of the ash removal door.
5. If the clamp handles do not clamp, adjust them as follows.
Figure 4/17 - Setting the pressure equalisation regulator
Auf
Zu
1
Figure 4/18 - Installing ash container(s)
3
2
1