4 Planning and installation – Scope of delivery
45
4.3 Scope of delivery
Included in the scope of delivery:
•
HDG Compact 99 - 200 boiler
•
Control cabinet model EMD-C 215 Exclusiv
•
Feeding system (customer-specific)
•
Delivery system (customer-specific)
•
Cleaning tools
•
Operating documentation
Upon delivery, check that the scope of delivery matches the informa-
tion on the delivery note.
The heating system HDG Compact 99 - 200 (1) is delivered on two
rectangular wooden planks (2). These wooden planks are intended
only for transportation and should be removed before installing the
system in its planned location.
Figure 4/12 - HDG Compact 100 boiler condition as delivered
1
2