Electrim
Digital Mashing Bin
-
Model EB1D
240v 2.4kw
Microprocessor Controlled Heat for Boiling, Mashing and Sparging
(Not suitable for fermenting unless alternative heat source is used)
INSTRUCTIONS PRIOR TO USE
The Electrim Bin comes ready assembled, but the security of the tap and element should be checked to avoid any possible leaks before use and after dismantling
for cleaning. The bin should be checked for leaks using cold water prior to using the heating element for the first time. The tap rubber ‘O’ ring should always be
fitted on the outside of the bin – tighten the nut on the inside fully and firmly but do not over tighten to avoid pinching the washer. The element rubber washer
should always be fitted on the inside of the bin. Always ensure that the element is level with the bottom of the bin and is not allowed to come into contact with
it. Again, fully and firmly tighten the element locking ring.
The control module should be connected to the element via the standard IEC kettle type plug,
ensuring that it is fully inserted
, and the thermostat sensor
should be inserted into the small copper tube located above the element. The rubber sleeve should be positioned over the tube and slid as far as possible up to
the metal gland.
Do not plug the control module into the mains supply until water is covering the element, as permanent damage will be caused.
Please ensure plug is fully inserted into element to prevent poor connection and overheating
INSTRUCTIONS FOR USE
Never allow the bin to be turned on unless the element is fully covered in liquid
If the unit is turned on inadvertently with the element dry it will be permanently damaged and the bucket may melt. Fill the bin with water to above the
minimum level mark before plugging in to the mains supply.
Standby Mode
The element can be temporarily switched off by putting the unit into Standby. Standby is turned On/Off by pressing
U
for 1 second. When in Standby mode the
display will go blank apart from a small red light in the bottom right hand corner.