![Fluke OC3port Plus User Manual Download Page 205](http://html.mh-extra.com/html/fluke/oc3port-plus/oc3port-plus_user-manual_2309945205.webp)
OC3port Plus
User Manual
6-74
Running a Cell Transfer Delay Test
To run a Cell Transfer Delay Test, do the following:
1. Press the
ATM
key. The
ATM SELECTIONS
menu is displayed.
2.
Press the
Down Arrow
key to move the
Quality of Service
option to the selection
line. Then, press
ENTER
. The
QUALITY OF SERVICE
submenu is displayed:
QUALITY OF SERVICE
- - - - - - - - - - - - - - - - - - - - - - - -
Cell Loss
1Pt Cel Dly Var 1
za134f.eps
3.
Press the
Down Arrow
key to move the
Cell Xfer Delay
option to the selection
line:
2 PT CELL DELAY VAR
STATUS: PROCESSING
PEAK TO PEAK CDV
0.09ct
za154f.eps
This option has eight settings (1-8), which respectively represent the eight
available transmission streams.
4. Press the
Left
or
Right Arrow
key to select the desired transmission stream.
Then, press
ENTER
. The Cell Transfer Delay Test begins. You see the
LOADING SELECTED TRAFFIC PATTERN
message on the LCD.
After loading the requested transmission pattern, the OC3port Plus displays
results to you on the LCD. See "Understanding Cell Transfer Delay Test
Results", which follows, for an explanation of the result display.
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com