![Fluke OC3port Plus User Manual Download Page 195](http://html.mh-extra.com/html/fluke/oc3port-plus/oc3port-plus_user-manual_2309945195.webp)
OC3port Plus
User Manual
6-64
Running a Remote Cell Loss Test
To run a Remote Cell Loss test, connect the two testers across the ATM network
ports under test. Then, complete the following steps first on the slave unit, then on
the master unit.
1. Press the
ATM
key. The
ATM SELECTIONS
menu is displayed.
2.
Press the
Down Arrow
key to move the
Quality of Service
option to the selection
line. Then, press
ENTER
. The
QUALITY OF SERVICE
submenu is displayed:
QUALITY OF SERVICE
- - - - - - - - - - - - - - - - - - - - - - - -
Cell Loss
1Pt Cel Dly Var 1
za134f.eps
3.
Make sure that the
Cell Loss
option is on the selection line. Then, press
ENTER
. The
CELL LOSS
submenu is displayed:
CELL LOSS:
- - - - - - - - - - - - - - - - - - - - - - - -
Start Cell Loss STD
Setup Cell Loss
za135f.eps
4. Make sure that the
Start Cell Loss
option is on the selection line. Then, do one
of the following:
a.
If the tester you are programming is the slave unit, press the
Left
or Right
Arrow
key to change the setting to
SLV
. Press
ENTER
. Then, go to Step 1
and complete this entire procedure again on the master unit.
b.
If the tester you are programming is the master unit, press the
Left
or
Right
Arrow
key to change the setting to
MAS
. Press
ENTER
.
The Remote Cell Loss test begins. The master and slave units synchronize
with each other. Then, results are provided to you on the master unit’s
LCD. See "Understanding Cell Loss Test Results", which follows, for a
detailed description of the test results.
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com