![Fluke OC3port Plus User Manual Download Page 202](http://html.mh-extra.com/html/fluke/oc3port-plus/oc3port-plus_user-manual_2309945202.webp)
Testing ATM Networks
Quality of Service Tests
6
6-71
The setup for this test is completed after you program the last transmission stream
parameter and press
ENTER
.
Running a 2-point CDV Test
To run a 2-point CDV test, do the following:
1. Press the
ATM
key. The
ATM SELECTIONS
menu is displayed.
2. Press the
Down Arrow
key to move the
Quality of Service
option to the selection
line. Then, press
ENTER
. The
QUALITY OF SERVICE
submenu is displayed.
3.
Press the
Down Arrow
key to move the
2Pt Cel Dly Var
option to the selection
line:
QUALITY OF SERVICE
1Pt Cel Dly Var 1
2Pt Cel Dly Var 1
Cell Xfer Delay
za153f.eps
This option has eight settings (1-8), which respectively represent the eight
available transmission streams.
4.
Press the
Left
or
Right Arrow
key to select the desired transmission stream.
Then, press
ENTER
. The Cell Delay Variation Test begins. You see the
LOADING SELECTED TRAFFIC PATTERN
message, which is followed by the
CDV test result display. For example:
2 PT CELL DELAY VAR
STATUS: PROCESSING
PEAK TO PEAK CDV
0.09ct
za154f.eps
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com