MFC
Installation
6.
189
Locking ring for PE hose with
3 clamping points
Locking ring for PVC hose with
2 clamping points
With rigid pipework
1
Connect the sample water pipework to the ball valve
connection threads.
2
Ensure that the sample water pipework is installed without
mechanical stress.
Connecting the sample water
outlet
Please note
Never use copper tubing.
1
On the non-pressurised version, no back-pressure is permitted
in the cell body. The sample water outlet must be open.
2
On the non-pressurised version, the sample water outlet must
be installed so that no siphon effect can occur.
Please note
Recommendation: Position the outlet above the hopper.
3
On the pressurised version, a maximum back pressure of 1.5
bar is permitted on the sample water outlet.
With hose connection
See installation instructions Page 188.
With rigid pipework
1
Connect the sample water pipework to the connection
nozzle.
2
Ensure that the sample water pipework is installed without
mechanical stress.
Connecting the drain
3
Ensure that the drain screw is always closed.
Summary of Contents for WALLACE & TIERNAN MFC
Page 1: ...WALLACE TIERNAN MULTI FUNCTION CONTROLLER MFC from version V 2 00 INSTRUCTION MANUAL...
Page 2: ...2 WT 050 580 000 DE IM 0714 MFC Please note Original manual...
Page 6: ...6 WT 050 580 000 DE IM 0714 Introduction MFC 1...
Page 40: ...40 WT 050 580 000 DE IM 0714 Description MFC 3...
Page 247: ...MFC Certificates 10 247 10 Certificates...
Page 248: ...248 WT 050 580 000 DE IM 0714 Certificates MFC 10...
Page 249: ...MFC Certificates 10 249...
Page 250: ...250 WT 050 580 000 DE IM 0714 Certificates MFC 10...
Page 262: ...262 WT 050 580 000 DE IM 0714 Settings table MFC 11...