2
(
37
&
38
) and back-up rings (
39
&
40
)
for damage, replace if necessary.
(Ref.
Fig. 2)
On 52 series swingdrive inspect
bearing (
41
) & seal (
42
) in brake
housing (
15
) replace if necessary.
10. Remove race (
12
) from input planet set
(
13
).
11. Remove input planet set (
13
) from gear
housing (
7
) by pulling straight up and out
of the housing.
12. Remove retaining ring (
13.4
), press out
the planet pins (
13.3
), remove the planet
gear (
13.2
), and needle bearings (
13.5
),
inspect for unusual wear. Replace as
required.
13. Remove race (
12
) from output planet set
(
10
).
14. Remove the output sun gear (
11
), from
the output planet carrier
(10.)
. Lift the
output planet set out of the housing
(7)
.
15. Remove the retaining ring (
10.4
). Press
out the planet pins (
10.3
); remove the
planet gear (
10.2
) and needle bearings
(
10.5
). Inspect for unusual wear.
Replace as required.
16. Remove bearing lock nut (
35
) and lock
washer (
34
).
17. Remove the pinion shaft (
1
) from the
housing (
7
) inspect the pinion shaft,
seal, and bearing for wear and replace if
necessary. Remove the inboard bearing
(
9
) and inspect for wear.
18. Remove outboard seal (
2
) and bearing
(
3
) Inspect for wear and replace if
necessary.
Summary of Contents for E190
Page 2: ......
Page 64: ...Hirschmann J1939 Install EEC 0110 V1 0 Hirschmann J1939 Network Installation...
Page 72: ...Hirschmann J1939 Install EEC 0110 V1 0 Hirschmann J1939 Network Installation...
Page 75: ...Hirschmann J1939 Install EEC 0110 V1 0 Hirschmann J1939 Network Installation...
Page 140: ......
Page 141: ......
Page 146: ...TITLE...
Page 147: ...TITLE...
Page 149: ...TITLE...
Page 150: ...TITLE...
Page 151: ...TITLE...
Page 152: ...TITLE...
Page 153: ......
Page 154: ......
Page 155: ......
Page 156: ......
Page 157: ...TITLE...
Page 158: ...TITLE...
Page 159: ...TITLE...
Page 160: ...TITLE...
Page 161: ...TITLE...
Page 162: ...TITLE...
Page 173: ...Bolt Torque EEC 0016 V1 2 Bolt Torque...
Page 179: ...Four Section Boom Operation aerial EEC 0081 V1 3 Four Section Boom Operation...
Page 199: ...Five Section Boom Operation aerial EEC 0080 V1 3 Five Section Boom Operation...
Page 227: ......
Page 230: ...1 INFORMAZIONI GENERALI GENERAL INFORMATION...
Page 248: ...8 ACCESSORI PER ARGANI DA SOLLEVAMENTO E TRAINO LIFTING AND RECOVERY WINCH ACCESSORIES...
Page 265: ...11 TABELLE DI CONVERSIONE CONVERSION TABLES...
Page 268: ...12 CONDIZIONI GENERALI DI VENDITA CONDITIONS OF SALE...
Page 279: ...4 5200S...
Page 280: ...5 6000S...
Page 333: ......
Page 334: ......
Page 357: ...Appendix B Parts Index ELLIOTT Built for You E190 Manual B 1...