Platform Install/Operation EEC-0049
V1.1
Platform Operation
The platform is permanently suspended in a yoke that can be attached to
the boom or jib head. The platform leveling system consists of a function selector
valve, a hydraulic cylinder and a hand pump assembly that includes a hydraulic
oil reservoir and handle.
Platform selector valve function positions
The leveling system can be used for the following functions:
A. Lift
the yoke for alignment with the jib or boom tips for attachment
B.
Swing the platform to the
stow
position in the yoke
C. Adjust
and
lock
platform level when its suspended in the yoke
Lift the yoke for jib/boom head attachment
Remove the horizontal locking pin from the arm and select the
PLTF LVL
CW/Yoke Up
position, use hand pump to raise yoke to position for attachment to
boom or jib.
Stow the platform in the yoke
Select the
PLTF LVL CCW/Yoke Down
position, use pump to raise the
platform into stow position, engage the stow pins and select the float position
Release the platform from the stow position
A.
Ensure the float position is selected, stand away from the platform swing
path and disengage the stow pins
B.
The float function allows the platform to pivot freely until level or end of
travel of the hydraulic cylinder
Float position lock
When engaged, the flow position lock prevents accidental selection of the
float function.
To avoid unintentional platform movement
, the brake should be selected and
the float lock engaged before any work commences from the platform when
boom is elevated.
Air Bleeding Process
The platform hydraulic system needs to be free of air to operate smoothly.
Any time any of the platform hydraulic lines are removed, or air is suspected in
Summary of Contents for E190
Page 2: ......
Page 64: ...Hirschmann J1939 Install EEC 0110 V1 0 Hirschmann J1939 Network Installation...
Page 72: ...Hirschmann J1939 Install EEC 0110 V1 0 Hirschmann J1939 Network Installation...
Page 75: ...Hirschmann J1939 Install EEC 0110 V1 0 Hirschmann J1939 Network Installation...
Page 140: ......
Page 141: ......
Page 146: ...TITLE...
Page 147: ...TITLE...
Page 149: ...TITLE...
Page 150: ...TITLE...
Page 151: ...TITLE...
Page 152: ...TITLE...
Page 153: ......
Page 154: ......
Page 155: ......
Page 156: ......
Page 157: ...TITLE...
Page 158: ...TITLE...
Page 159: ...TITLE...
Page 160: ...TITLE...
Page 161: ...TITLE...
Page 162: ...TITLE...
Page 173: ...Bolt Torque EEC 0016 V1 2 Bolt Torque...
Page 179: ...Four Section Boom Operation aerial EEC 0081 V1 3 Four Section Boom Operation...
Page 199: ...Five Section Boom Operation aerial EEC 0080 V1 3 Five Section Boom Operation...
Page 227: ......
Page 230: ...1 INFORMAZIONI GENERALI GENERAL INFORMATION...
Page 248: ...8 ACCESSORI PER ARGANI DA SOLLEVAMENTO E TRAINO LIFTING AND RECOVERY WINCH ACCESSORIES...
Page 265: ...11 TABELLE DI CONVERSIONE CONVERSION TABLES...
Page 268: ...12 CONDIZIONI GENERALI DI VENDITA CONDITIONS OF SALE...
Page 279: ...4 5200S...
Page 280: ...5 6000S...
Page 333: ......
Page 334: ......
Page 357: ...Appendix B Parts Index ELLIOTT Built for You E190 Manual B 1...