Platform Safety-aerial EEC-0070
V1.3
Platform Safety
Aerial devices are designed and intended to be used for handling personnel. Guidance
on the use of aerial devices is from
ANSI/SIA A92.2
(latest).
Personnel Platform Usage Guidelines
A.
The aerial device shall not be used for other lifting operations while handling
personnel. Downhaul weight or load-block must be removed from loadline. The
loadline must be stowed on top of main boom. Anti-two-block switch must be
overridden.
B.
Upper and lower controls shall be tested and inspected daily prior to use.
C.
Only authorized persons shall operate the aerial device.
D.
Operator and any crewmembers on the ground shall be in constant communication.
E.
Boom and platform load ratings or work areas shall not be exceeded. Personnel in
the platform shall wear a body harness (fall protection device) that is securely
attached to the supplied lanyard attachment points at all times. Personnel in the
platform shall always stand firmly on the floor of the platform and not climb or sit on
the rails of the platform. Nor should personnel use planks, ladders or any other
materials for obtaining additional working height or reach.
F.
Belting off to structures other than the platform while on platform shall not be
permitted.
G.
The aerial device shall not be moved when
the boom is elevated. The aerial shall be
supported by a firm surface. Blocking may
be required to ensure that the load-bearing
surface can support the weight of aerial
operations. Provided outriggers shall be
properly extended and no lifting of
personnel is allowed when the aerial
device is supported by tires.
H.
The personnel platform and aerial device
are not insulated. Do not operate near power lines or electrical hazards.
MINIMUM CLEARANCE REQUIREMENTS
Minimum
Nominal Voltage kV
Distance
(Phase to Phase)
Required
Up to 50
10 feet
Over
50
10
feet
plus 1 foot for every 30 kV over 50
kV
Summary of Contents for E190
Page 2: ......
Page 64: ...Hirschmann J1939 Install EEC 0110 V1 0 Hirschmann J1939 Network Installation...
Page 72: ...Hirschmann J1939 Install EEC 0110 V1 0 Hirschmann J1939 Network Installation...
Page 75: ...Hirschmann J1939 Install EEC 0110 V1 0 Hirschmann J1939 Network Installation...
Page 140: ......
Page 141: ......
Page 146: ...TITLE...
Page 147: ...TITLE...
Page 149: ...TITLE...
Page 150: ...TITLE...
Page 151: ...TITLE...
Page 152: ...TITLE...
Page 153: ......
Page 154: ......
Page 155: ......
Page 156: ......
Page 157: ...TITLE...
Page 158: ...TITLE...
Page 159: ...TITLE...
Page 160: ...TITLE...
Page 161: ...TITLE...
Page 162: ...TITLE...
Page 173: ...Bolt Torque EEC 0016 V1 2 Bolt Torque...
Page 179: ...Four Section Boom Operation aerial EEC 0081 V1 3 Four Section Boom Operation...
Page 199: ...Five Section Boom Operation aerial EEC 0080 V1 3 Five Section Boom Operation...
Page 227: ......
Page 230: ...1 INFORMAZIONI GENERALI GENERAL INFORMATION...
Page 248: ...8 ACCESSORI PER ARGANI DA SOLLEVAMENTO E TRAINO LIFTING AND RECOVERY WINCH ACCESSORIES...
Page 265: ...11 TABELLE DI CONVERSIONE CONVERSION TABLES...
Page 268: ...12 CONDIZIONI GENERALI DI VENDITA CONDITIONS OF SALE...
Page 279: ...4 5200S...
Page 280: ...5 6000S...
Page 333: ......
Page 334: ......
Page 357: ...Appendix B Parts Index ELLIOTT Built for You E190 Manual B 1...