Four Section Boom Operation-aerial EEC-0081
V1.3
Four Section Boom Operation
Boom Disassembly Alternative
A.
Gaining access through rear of boom, loosen capscrews retaining the keeper
plates holding the extend cable anchor and retract cables in the rear of the 3
rd
section, remove keeper plates.
B.
Extend boom 24 inches (60 cm). Loosen and remove the nuts which secure the
extend cables to the cable anchor plate. Tag and disconnect hydraulic lines to
the extend cylinder.
C.
Drape extend cables inside boom and slide cable anchor plate out of the side of
the winch mount if winch has been removed from boom.
D.
Loosen and remove two capscrews, lockwashers and spacers which anchor the
extend cylinder rod butt plate to the rear of the 1
st
section.
E.
Loosen and remove two capscrews and lockwashers securing spacer bar to the
inside top of the front of the 1
st
section. Remove spacer bar.
F.
Loosen and remove four capscrews securing wear pads to the bottom of the 1
st
section. Removal of side wear pads is optional. Adequate clearance exists
between adjoining section side pads for boom disassembly. If side pad removal
is required, tag all pads, shims and corresponding locations for proper
reassembly.
G.
Support 2
nd
-3
rd
-4
th
assembly at the front with an appropriate lifting method. Raise
the 2
nd
-3
rd
-4
th
assembly inside the 1
st
section to allow for front bottom pad
removal. Remove bottom wear pads.
H.
With the 2
nd
-3
rd
-4
th
assembly supported, slide assembly out of the 1
st
. Relocation
of the sling point on the 2
nd
-3
rd
-4
th
assembly will be necessary for proper
balancing of the assembly as it slides out of the 1
st
section. Keep tension on
retract cables as the assembly is pulled out of the 1
st
to minimize the chance of
retract cable damage.
I.
Place 2
nd
-3
rd
-4
th
assembly on a suitable horizontal surface. Take care not to
pinch or crush retract cables while lifting or supporting assembly.
Summary of Contents for E190
Page 2: ......
Page 64: ...Hirschmann J1939 Install EEC 0110 V1 0 Hirschmann J1939 Network Installation...
Page 72: ...Hirschmann J1939 Install EEC 0110 V1 0 Hirschmann J1939 Network Installation...
Page 75: ...Hirschmann J1939 Install EEC 0110 V1 0 Hirschmann J1939 Network Installation...
Page 140: ......
Page 141: ......
Page 146: ...TITLE...
Page 147: ...TITLE...
Page 149: ...TITLE...
Page 150: ...TITLE...
Page 151: ...TITLE...
Page 152: ...TITLE...
Page 153: ......
Page 154: ......
Page 155: ......
Page 156: ......
Page 157: ...TITLE...
Page 158: ...TITLE...
Page 159: ...TITLE...
Page 160: ...TITLE...
Page 161: ...TITLE...
Page 162: ...TITLE...
Page 173: ...Bolt Torque EEC 0016 V1 2 Bolt Torque...
Page 179: ...Four Section Boom Operation aerial EEC 0081 V1 3 Four Section Boom Operation...
Page 199: ...Five Section Boom Operation aerial EEC 0080 V1 3 Five Section Boom Operation...
Page 227: ......
Page 230: ...1 INFORMAZIONI GENERALI GENERAL INFORMATION...
Page 248: ...8 ACCESSORI PER ARGANI DA SOLLEVAMENTO E TRAINO LIFTING AND RECOVERY WINCH ACCESSORIES...
Page 265: ...11 TABELLE DI CONVERSIONE CONVERSION TABLES...
Page 268: ...12 CONDIZIONI GENERALI DI VENDITA CONDITIONS OF SALE...
Page 279: ...4 5200S...
Page 280: ...5 6000S...
Page 333: ......
Page 334: ......
Page 357: ...Appendix B Parts Index ELLIOTT Built for You E190 Manual B 1...