Four Section Boom Operation-aerial EEC-0081
V1.3
Four Section Boom Operation
R.
Remove the extend cylinder from the boom. Do not allow the sheaves to fall off
the pin on the end of the extend cylinder. Remove extend cables. Place cylinder
and cables in suitable area to prevent possible damage.
S.
Loosen and remove two capscrews, cable guide, wear pad and spacer bar from
the front top of the second section.
T.
Loosen and remove four capscrews attaching the bottom pad plate to the second
section. Slightly lift third section and remove pad plate.
U.
Slide 3
rd
section out of 2
nd
section. Removal of side pads is optional, as the side
pads have adequate clearance for boom disassembly. If removal of side pads is
required, tag all shims, pads and corresponding locations for proper re-assembly.
V.
Loosen and remove two capscrews, cable guide wear pad and spacer bar from
the front top of the third section.
W.
Loosen and remove four capscrews attaching the bottom pad plate to the third
section. Slightly lift 4
th
section and remove pad plate.
X.
Slide 4
th
section out of 3
rd
section. Removal of side pads is optional, as the side
pads have adequate clearance for the boom disassembly. If removal of the side
pads is required. Tag all shims, pads and corresponding locations for proper
reassembly.
Y.
Loosen and remove all remaining capscrews and wear pads from sections.
Additional Maintenance, Disassembled Boom
A.
Clean all boom sections and inspect for wear, dents, bent or crooked boom
sections, gouged metal, broken welds or any abnormal conditions. Repair or
replace as required.
B.
Inspect all sheaves for excessive groove wear or abnormal rim wear. Replace as
required.
C.
Inspect all sheave bearings for excessive wear or cut inner liner material. If
installed bearing diameter is .015 inch (.38 mm) larger than pin diameter, bearing
must be replaced. Any cut or gouge which causes the bearing liner to lose
strands is cause for bearing replacement.
Summary of Contents for E190
Page 2: ......
Page 64: ...Hirschmann J1939 Install EEC 0110 V1 0 Hirschmann J1939 Network Installation...
Page 72: ...Hirschmann J1939 Install EEC 0110 V1 0 Hirschmann J1939 Network Installation...
Page 75: ...Hirschmann J1939 Install EEC 0110 V1 0 Hirschmann J1939 Network Installation...
Page 140: ......
Page 141: ......
Page 146: ...TITLE...
Page 147: ...TITLE...
Page 149: ...TITLE...
Page 150: ...TITLE...
Page 151: ...TITLE...
Page 152: ...TITLE...
Page 153: ......
Page 154: ......
Page 155: ......
Page 156: ......
Page 157: ...TITLE...
Page 158: ...TITLE...
Page 159: ...TITLE...
Page 160: ...TITLE...
Page 161: ...TITLE...
Page 162: ...TITLE...
Page 173: ...Bolt Torque EEC 0016 V1 2 Bolt Torque...
Page 179: ...Four Section Boom Operation aerial EEC 0081 V1 3 Four Section Boom Operation...
Page 199: ...Five Section Boom Operation aerial EEC 0080 V1 3 Five Section Boom Operation...
Page 227: ......
Page 230: ...1 INFORMAZIONI GENERALI GENERAL INFORMATION...
Page 248: ...8 ACCESSORI PER ARGANI DA SOLLEVAMENTO E TRAINO LIFTING AND RECOVERY WINCH ACCESSORIES...
Page 265: ...11 TABELLE DI CONVERSIONE CONVERSION TABLES...
Page 268: ...12 CONDIZIONI GENERALI DI VENDITA CONDITIONS OF SALE...
Page 279: ...4 5200S...
Page 280: ...5 6000S...
Page 333: ......
Page 334: ......
Page 357: ...Appendix B Parts Index ELLIOTT Built for You E190 Manual B 1...