Four Section Boom Operation-aerial EEC-0081
V1.3
Four Section Boom Operation
D.
Torque the large extend cables to 22 ft-lb (12.2 N.m). Cable adjustment point is
located at the rear of the boom on the cable anchor located in the rear of the 2
nd
section.
E.
Torque 3/2/1 retract cables to 9 ft-lb (12.2 N.m). Cable adjustment point is
located at the sheave case end of the boom, on the bottom of the 1
st
section. Use
the flats at the front of the cable ends to keep the cables from turning while
torqueing retainer nuts.
F.
Torque 1/2/3 extend cable to 9 ft-lb (12.2N.m). Cable adjustment point is located
at rear of boom on the winch crossbar spanning the 1
st
section.
G.
Repeat steps 4,5,6 and 7, torqueing the 4/3/2 retract cables to 14 ft-lb (19 N.m).
Torque the large extend cables to 45 ft-lb (61 N.m). The 3/2/3 retract cables to 18
ft-lb (24 N.m) and the 1/2/3 extend cable to 18 ft-lb (24 N.m).
H.
Cycle the boom fully, check that all the cables are torqued properly and that all
sections are retracted completely, utilizing scribe marks or bottoming position of
2/3/4 Extend Cables
4/3/2 Retract Cables
1
st
Section 2
nd
Section 3
rd
Section 4
th
Section
Summary of Contents for E190
Page 2: ......
Page 64: ...Hirschmann J1939 Install EEC 0110 V1 0 Hirschmann J1939 Network Installation...
Page 72: ...Hirschmann J1939 Install EEC 0110 V1 0 Hirschmann J1939 Network Installation...
Page 75: ...Hirschmann J1939 Install EEC 0110 V1 0 Hirschmann J1939 Network Installation...
Page 140: ......
Page 141: ......
Page 146: ...TITLE...
Page 147: ...TITLE...
Page 149: ...TITLE...
Page 150: ...TITLE...
Page 151: ...TITLE...
Page 152: ...TITLE...
Page 153: ......
Page 154: ......
Page 155: ......
Page 156: ......
Page 157: ...TITLE...
Page 158: ...TITLE...
Page 159: ...TITLE...
Page 160: ...TITLE...
Page 161: ...TITLE...
Page 162: ...TITLE...
Page 173: ...Bolt Torque EEC 0016 V1 2 Bolt Torque...
Page 179: ...Four Section Boom Operation aerial EEC 0081 V1 3 Four Section Boom Operation...
Page 199: ...Five Section Boom Operation aerial EEC 0080 V1 3 Five Section Boom Operation...
Page 227: ......
Page 230: ...1 INFORMAZIONI GENERALI GENERAL INFORMATION...
Page 248: ...8 ACCESSORI PER ARGANI DA SOLLEVAMENTO E TRAINO LIFTING AND RECOVERY WINCH ACCESSORIES...
Page 265: ...11 TABELLE DI CONVERSIONE CONVERSION TABLES...
Page 268: ...12 CONDIZIONI GENERALI DI VENDITA CONDITIONS OF SALE...
Page 279: ...4 5200S...
Page 280: ...5 6000S...
Page 333: ......
Page 334: ......
Page 357: ...Appendix B Parts Index ELLIOTT Built for You E190 Manual B 1...