Hand Signals EEC-0043
V1.1
Hand Signals
Standard Hand Signals for
Crane Operators
ASME B30.5-1998
HOIST. With forearm
vertical, and forefinger
pointing up, move hand in
small horizontal circle.
LOWER. With arm extended
downward, forefinger
pointing down, move hand in
a small horizontal circle.
USE MAIN HOIST.
Tap fist on head; then use
regular signals.
USE WHIPLINE. (Auxiliary
Hoist) Tap elbow with one
hand; then use regular
signals.
RAISE BOOM. Arm
extended, fingers closed,
thumb pointing upward.
LOWER BOOM. Arm
extended, fingers closed,
thumb pointing downward.
MOVE SLOWLY. Use one
hand to give any motion
signal and place other hand
motionless in front of hand
giving the motion signal.
(Hoist Slowly shown as
example)
RAISE THE BOOM AND
LOWER THE LOAD. With
arm extended, thumb
pointing up, flex fingers in
and out as long as load
movement is desired.
LOWER THE BOOM AND
RAISE THE LOAD. With
arm extended, thumb
pointing down, flex fingers
in and out as long as load
movement is desired.
SWING. Arm extended,
point with finger in direction
of swing of boom.
STOP. Arm extended, palm
down, move arm back and
forth horizontally.
EMERGENCY STOP. Both
arms extended, palms
down, move arms back and
forth horizontally.
DOG EVERYTHING. Clasp
hands in front of body.
EXTEND BOOM.
(Telescoping Booms). One
Hand Signal. One fist in
front of chest with thumb
tapping chest.
RETRACT BOOM.
(Telescoping Booms). One
Hand Signal. One fist in
front of chest, thumb
pointing outward and heel
of fist tapping chest.
RETRACT BOOM.
(Telescoping Booms). Both
fists in front of body with
thumbs pointing toward
each other.
EXTEND BOOM.
(Telescoping Booms). Both
fists in front of body with
thumbs pointing outward.
Summary of Contents for E190
Page 2: ......
Page 64: ...Hirschmann J1939 Install EEC 0110 V1 0 Hirschmann J1939 Network Installation...
Page 72: ...Hirschmann J1939 Install EEC 0110 V1 0 Hirschmann J1939 Network Installation...
Page 75: ...Hirschmann J1939 Install EEC 0110 V1 0 Hirschmann J1939 Network Installation...
Page 140: ......
Page 141: ......
Page 146: ...TITLE...
Page 147: ...TITLE...
Page 149: ...TITLE...
Page 150: ...TITLE...
Page 151: ...TITLE...
Page 152: ...TITLE...
Page 153: ......
Page 154: ......
Page 155: ......
Page 156: ......
Page 157: ...TITLE...
Page 158: ...TITLE...
Page 159: ...TITLE...
Page 160: ...TITLE...
Page 161: ...TITLE...
Page 162: ...TITLE...
Page 173: ...Bolt Torque EEC 0016 V1 2 Bolt Torque...
Page 179: ...Four Section Boom Operation aerial EEC 0081 V1 3 Four Section Boom Operation...
Page 199: ...Five Section Boom Operation aerial EEC 0080 V1 3 Five Section Boom Operation...
Page 227: ......
Page 230: ...1 INFORMAZIONI GENERALI GENERAL INFORMATION...
Page 248: ...8 ACCESSORI PER ARGANI DA SOLLEVAMENTO E TRAINO LIFTING AND RECOVERY WINCH ACCESSORIES...
Page 265: ...11 TABELLE DI CONVERSIONE CONVERSION TABLES...
Page 268: ...12 CONDIZIONI GENERALI DI VENDITA CONDITIONS OF SALE...
Page 279: ...4 5200S...
Page 280: ...5 6000S...
Page 333: ......
Page 334: ......
Page 357: ...Appendix B Parts Index ELLIOTT Built for You E190 Manual B 1...