Five Section Boom Operation-aerial EEC-0080
V1.3
Five Section Boom Operation
I.
Torque the 1/2/3 extend cables to 7 ft-lb (9.5 N.m) each. These cables are located at
the top of the 1
st
section boom winch bar.
J.
Check to ensure that boom sections are all bottoming out simultaneously as in Step
2. If not, proceed as follows:
1. If the second section is bottoming out first, equally loosen the 1/2/3 extend cables
and tighten the 3/2/1 retract cables. This will cause the second section boom to
bottom out later but will also cause the 3
rd
, 4
th
and 5
th
sections to bottom out
sooner.
2. If the 3
rd
section is bottoming out first, equally loosen the 3/2/1 retract cables and
tighten the 1/2/3 extend cables. This will cause the 3
rd
, 4
th
and 5
th
sections to
bottom later and the 2
nd
section boom to bottom sooner.
3. If the 4
th
section is bottoming out first, equally loosen the 4/3/2 retract cables and
tighten 2/3/4 extend cables. This will cause the 4
th
and 5
th
sections to bottom out
later and the 2
nd
and 3
rd
sections to bottom out sooner.
4. If the 5
th
section is bottoming out first, equally loosen the 5/4/3 retract cables and
tighten the 3/4/5 extend cables. This will cause the 5
th
section to bottom out later
and the 2
nd
, 3
rd
and 4
th
sections to bottom out sooner.
K.
Cycle the boom a few feet out and in. Check to ensure that all sections are
bottoming out simultaneously.
Repeat step J as required
.
L.
Repeat Steps 4 through 9. Torque the 5/4/3 retract cables to 12 ft-lb (16.26 N.m).
Torque the 3/4/5 extend cables to 30 ft-lb (40 N.m). Torque the 4/3/2 retract cables
to 14 ft-lb ( 19 N.m). Torque the 2/3/4 extend cables to 45 ft-lb (61 N.m). Torque the
3/2/1 retract cables to 18 ft-lb (24 N.m) Torque the 1/2/3 extend cables to 14 ft-lb (19
N.m).
M.
Cycle boom fully, check that all cables are torqued properly and that all sections are
bottoming out simultaneously.
Repeat Step J as required
then add locknuts to all
cables. Each threaded cable end must have two nuts locked together.
Summary of Contents for E190
Page 2: ......
Page 64: ...Hirschmann J1939 Install EEC 0110 V1 0 Hirschmann J1939 Network Installation...
Page 72: ...Hirschmann J1939 Install EEC 0110 V1 0 Hirschmann J1939 Network Installation...
Page 75: ...Hirschmann J1939 Install EEC 0110 V1 0 Hirschmann J1939 Network Installation...
Page 140: ......
Page 141: ......
Page 146: ...TITLE...
Page 147: ...TITLE...
Page 149: ...TITLE...
Page 150: ...TITLE...
Page 151: ...TITLE...
Page 152: ...TITLE...
Page 153: ......
Page 154: ......
Page 155: ......
Page 156: ......
Page 157: ...TITLE...
Page 158: ...TITLE...
Page 159: ...TITLE...
Page 160: ...TITLE...
Page 161: ...TITLE...
Page 162: ...TITLE...
Page 173: ...Bolt Torque EEC 0016 V1 2 Bolt Torque...
Page 179: ...Four Section Boom Operation aerial EEC 0081 V1 3 Four Section Boom Operation...
Page 199: ...Five Section Boom Operation aerial EEC 0080 V1 3 Five Section Boom Operation...
Page 227: ......
Page 230: ...1 INFORMAZIONI GENERALI GENERAL INFORMATION...
Page 248: ...8 ACCESSORI PER ARGANI DA SOLLEVAMENTO E TRAINO LIFTING AND RECOVERY WINCH ACCESSORIES...
Page 265: ...11 TABELLE DI CONVERSIONE CONVERSION TABLES...
Page 268: ...12 CONDIZIONI GENERALI DI VENDITA CONDITIONS OF SALE...
Page 279: ...4 5200S...
Page 280: ...5 6000S...
Page 333: ......
Page 334: ......
Page 357: ...Appendix B Parts Index ELLIOTT Built for You E190 Manual B 1...