Five Section Boom Operation-aerial EEC-0080
V1.3
Five Section Boom Operation
I.
Remove lower L-pads, retract cables and retract cable retaining capscrews from rear
of 2
nd
section. Remove retract cable retaining plates from the rear of the 3
rd
section.
Remove 3/2/1 retract cables from anchor pocket in 3
rd
section.
J.
Remove retaining capscrews from cylinder anchor channels in the rear of the 2
nd
section. Remove upper top wear pads and cam plates from upper rear of the 3
rd
section.
K.
Remove cable guide and upper spacer bar/cable retainers from the front top of the
2
nd
section. Attach a sling or chain to the tip of the 3
rd
section boom and pull the 3
rd
-
4
th
-5
th
assembly out of the 2nd approximately 12 inches (30cm). Suspend the 3
rd
section off of the lower wear pads.
L.
Remove capscrews retaining 1/2/3 extend sheaves to the top plate of the 2
nd
section, this will allow the sheaves, pins and extend cables to lie on the top plate of
the 3
rd
section.
M.
Remove 4 capscrews which retain the lower front pad plate to the 2
nd
section.
Remove pad plate. Remove and tag four side wear pads with shims from front of 2
nd
section. Pull the retract cables out and keep retract cables taut while pulling the 3
rd
-
4
th
-5
th
assembly out of the 2
nd
section. Support the base end of the 3
rd
as it exits the
2
nd
section boom.
N.
Place 3
rd
-4
th
-5
th
assembly on a suitable horizontal surface. Take care not to damage
the retract cables while lifting or supporting the 3
rd
-4
th
-5
th
assembly. Remove 1/2/3
extend cables from the top of the 3
rd
section by removing the anchor plates and
capscrews at the rear of the section, place cables in an area to avoid damage.
O.
Remove lower L-pads, retract cables and retract cable retaining capscrews from rear
of 3
rd
section. Remove retract cable retaining plates from the rear of the 4
th
section.
Remove 4/3/2 retract cables from the anchor pocket in the 4
th
section.
P.
Remove lock bar and hardware from extend cylinder collar anchor pocket in the 3
rd
section. Lifting the butt plate end of the cylinder up will disengage the cylinder from
its anchor pockets in the 3
rd
section. Slowly pull cylinder out of the 3/4/5 assembly.
Keep 2/3/4 extend cables taut and in position to avoid damage as cylinder exits
Summary of Contents for E190
Page 2: ......
Page 64: ...Hirschmann J1939 Install EEC 0110 V1 0 Hirschmann J1939 Network Installation...
Page 72: ...Hirschmann J1939 Install EEC 0110 V1 0 Hirschmann J1939 Network Installation...
Page 75: ...Hirschmann J1939 Install EEC 0110 V1 0 Hirschmann J1939 Network Installation...
Page 140: ......
Page 141: ......
Page 146: ...TITLE...
Page 147: ...TITLE...
Page 149: ...TITLE...
Page 150: ...TITLE...
Page 151: ...TITLE...
Page 152: ...TITLE...
Page 153: ......
Page 154: ......
Page 155: ......
Page 156: ......
Page 157: ...TITLE...
Page 158: ...TITLE...
Page 159: ...TITLE...
Page 160: ...TITLE...
Page 161: ...TITLE...
Page 162: ...TITLE...
Page 173: ...Bolt Torque EEC 0016 V1 2 Bolt Torque...
Page 179: ...Four Section Boom Operation aerial EEC 0081 V1 3 Four Section Boom Operation...
Page 199: ...Five Section Boom Operation aerial EEC 0080 V1 3 Five Section Boom Operation...
Page 227: ......
Page 230: ...1 INFORMAZIONI GENERALI GENERAL INFORMATION...
Page 248: ...8 ACCESSORI PER ARGANI DA SOLLEVAMENTO E TRAINO LIFTING AND RECOVERY WINCH ACCESSORIES...
Page 265: ...11 TABELLE DI CONVERSIONE CONVERSION TABLES...
Page 268: ...12 CONDIZIONI GENERALI DI VENDITA CONDITIONS OF SALE...
Page 279: ...4 5200S...
Page 280: ...5 6000S...
Page 333: ......
Page 334: ......
Page 357: ...Appendix B Parts Index ELLIOTT Built for You E190 Manual B 1...