Five Section Boom Operation-aerial EEC-0080
V1.3
Five Section Boom Operation
L.
Assemble top rear wear pads with the cam plates to the top of the 5
th
section. The
wear pad on each side of the top/rear of the boom can be adjusted over a range of
3/16 inch (4.8mm) by rotating, end for end, the wear pad and plate or the wear pads
and plate independently. This is possible because the holes in these parts are offset
from the center. The holes are .06 inch (1.5mm) off center in the plate and .03 inch
(.8mm) off center in the wear pad. Various combinations of rotation of these parts
allow this adjustment.
M.
Pull threaded ends of 5/4/3 retract cable, now under the 4
th
section, towards front of
boom.
N.
Position 4
th
-5
th
section in front of 3
rd
section, ready for assembly. Route 5/4/3 retract
cables to allow easy cable movement as the sections slide together.
O.
Slide 4
th
-5
th
section into 3
rd
boom section approximately 36 inches (90cm) keep 4
th
-
5
th
sections suspended to avoid damage to 5/4/3 retract cables.
P.
Assemble bottom wear pads on 3
rd
section pad plate, raise 4
th
-5
th
section high
enough in 3
rd
to allow plate with pads to slide between the sections, place retract
cables in the grooves in the bottom pad plate, as boom sections are slid together,
retract cables will pull through these grooves, use appropriate hardware and fasten
pad plate to the bottom plate of the 3
rd
section.
Q.
Install a nut on the threaded ends of the 5/4/3 retract cables, to keep the cable ends
from pulling through the anchor as the sections are pushed together.
R.
Push the 4
th
-5
th
section inside the 3
rd
section, until it is within 36 inches (90cm) of full
insertion.
S.
Install side wear pads with appropriate shims on front inside of the 3
rd
section boom.
Install upper spacer bar and cable guide with wear pad and related hardware on the
top to the 3
rd
section. Shim according to calibration instructions, or as pads were
originally removed and tagged.
T.
Slide 4
th
-5
th
section inside 3
rd
until the end of the 4
th
section hits against the doubler
bars in the 3
rd
section. Use caution as the 5/4/3 retract cable threaded end gets
close to the grooves in the lower front pad plate, adjust as necessary to allow proper
Summary of Contents for E190
Page 2: ......
Page 64: ...Hirschmann J1939 Install EEC 0110 V1 0 Hirschmann J1939 Network Installation...
Page 72: ...Hirschmann J1939 Install EEC 0110 V1 0 Hirschmann J1939 Network Installation...
Page 75: ...Hirschmann J1939 Install EEC 0110 V1 0 Hirschmann J1939 Network Installation...
Page 140: ......
Page 141: ......
Page 146: ...TITLE...
Page 147: ...TITLE...
Page 149: ...TITLE...
Page 150: ...TITLE...
Page 151: ...TITLE...
Page 152: ...TITLE...
Page 153: ......
Page 154: ......
Page 155: ......
Page 156: ......
Page 157: ...TITLE...
Page 158: ...TITLE...
Page 159: ...TITLE...
Page 160: ...TITLE...
Page 161: ...TITLE...
Page 162: ...TITLE...
Page 173: ...Bolt Torque EEC 0016 V1 2 Bolt Torque...
Page 179: ...Four Section Boom Operation aerial EEC 0081 V1 3 Four Section Boom Operation...
Page 199: ...Five Section Boom Operation aerial EEC 0080 V1 3 Five Section Boom Operation...
Page 227: ......
Page 230: ...1 INFORMAZIONI GENERALI GENERAL INFORMATION...
Page 248: ...8 ACCESSORI PER ARGANI DA SOLLEVAMENTO E TRAINO LIFTING AND RECOVERY WINCH ACCESSORIES...
Page 265: ...11 TABELLE DI CONVERSIONE CONVERSION TABLES...
Page 268: ...12 CONDIZIONI GENERALI DI VENDITA CONDITIONS OF SALE...
Page 279: ...4 5200S...
Page 280: ...5 6000S...
Page 333: ......
Page 334: ......
Page 357: ...Appendix B Parts Index ELLIOTT Built for You E190 Manual B 1...