ANSI/SIA Weather EEC-0036
V1.2
Responsibilities per
ANSI/SIA A92.2
accordance with the manufacturer’s recommendations. Such intervals are
dependent upon component function and exposure to wear, deterioration and
other agents which adversely affect component life. Two classifications are
designated:
a.
Frequent Inspection and Test: Daily to monthly intervals.
b.
Periodic Inspection and Test: One to twelve month intervals.
3. Frequent Inspection and Test:
Items determined by the owner in
accordance with the manufacturer'’ recommendations for each specific aerial
device shall be inspected for defects. The following tests and inspections
shall be performed by the operator once daily, prior to first use:
a.
Operating controls and associated mechanisms for conditions interfering
with proper operation.
b.
Visual and audible safety devices for malfunction.
c.
Hydraulic or pneumatic systems for observable deterioration or excessive
leakage.
d.
Fiberglass and other insulating components for visible damage or
contamination.
e.
Missing or illegible operational and instructional markings.
f.
Electrical systems of / or related to the aerial device for malfunction, signs
of excessive deterioration, dirt and moisture accumulation.
g.
Visual inspection of bolts, pins, and other fasteners for loose, deformed or
missing fasteners and other locking devices.
Any suspected items shall be carefully examined or tested and a determination
made by a qualified person as to whether they constitute a safety hazard.
All
unsafe items shall be replaced or repaired before use.
4. Periodic Inspection or Test:
An inspection of the mobile unit shall be
performed at the intervals defined in
B.2
depending upon its activity, severity
of service, and environment, or as specifically indicated below. (These
inspections shall include the requirements of
B.3
):
a.
Structural members for deformation, cracks or corrosion.
Summary of Contents for E190
Page 2: ......
Page 64: ...Hirschmann J1939 Install EEC 0110 V1 0 Hirschmann J1939 Network Installation...
Page 72: ...Hirschmann J1939 Install EEC 0110 V1 0 Hirschmann J1939 Network Installation...
Page 75: ...Hirschmann J1939 Install EEC 0110 V1 0 Hirschmann J1939 Network Installation...
Page 140: ......
Page 141: ......
Page 146: ...TITLE...
Page 147: ...TITLE...
Page 149: ...TITLE...
Page 150: ...TITLE...
Page 151: ...TITLE...
Page 152: ...TITLE...
Page 153: ......
Page 154: ......
Page 155: ......
Page 156: ......
Page 157: ...TITLE...
Page 158: ...TITLE...
Page 159: ...TITLE...
Page 160: ...TITLE...
Page 161: ...TITLE...
Page 162: ...TITLE...
Page 173: ...Bolt Torque EEC 0016 V1 2 Bolt Torque...
Page 179: ...Four Section Boom Operation aerial EEC 0081 V1 3 Four Section Boom Operation...
Page 199: ...Five Section Boom Operation aerial EEC 0080 V1 3 Five Section Boom Operation...
Page 227: ......
Page 230: ...1 INFORMAZIONI GENERALI GENERAL INFORMATION...
Page 248: ...8 ACCESSORI PER ARGANI DA SOLLEVAMENTO E TRAINO LIFTING AND RECOVERY WINCH ACCESSORIES...
Page 265: ...11 TABELLE DI CONVERSIONE CONVERSION TABLES...
Page 268: ...12 CONDIZIONI GENERALI DI VENDITA CONDITIONS OF SALE...
Page 279: ...4 5200S...
Page 280: ...5 6000S...
Page 333: ......
Page 334: ......
Page 357: ...Appendix B Parts Index ELLIOTT Built for You E190 Manual B 1...