ANSI/SIA Weather EEC-0036
V1.2
Responsibilities per
ANSI/SIA A92.2
k.
Actual operation of the aerial device. Under the direction of a qualified
person, the trainee shall operate the aerial device for a sufficient period of
time to demonstrate proficiency in the actual operation of the aerial device.
l.
Proper use of personal fall protection equipment.
2. Retraining:
The operator shall be retrained, when so directed by the user,
based on the user’s observation and evaluation of the operator.
3. Familiarization.
When an operator is directed to operate an aerial device
he/she is not familiar with, the operator, prior to operating, shall be instructed
regarding the following items and issues:
a.
The location of the manuals.
b.
The purpose and function of all controls.
c.
Safety devices and operating characteristics specific to the aerial device.
Responsibilities of Renters, Lessors or Lessees
A. General Responsibilities:
Each renter or lessor or lessee shall comply with the
requirements of the applicable section or sections below.
1.
Lessor or Lessee as Dealer or Installer:
When a lessor or lessee uses the
aerial device as a dealer or installer he shall have the same responsibilities as
specified under Section 7 of this standard.
2. Lessor or Lessee as Owner:
When a lessor or lessee uses the aerial device
as an owner he shall have the same responsibilities as specified under
Section 8 of this standard.
3. Lessor or Lessee as User:
When a lessor or lessee uses the aerial device
as a user he shall have the same responsibilities as specified under Section 9
of this standard.
4. Lessor or Lessee as Operator:
When a lessor or lessee uses the aerial
device as an operator he shall have the same responsibilities as specified
under Section 10 of this standard.
B. Ownership Duties
: The renter or lessor shall carry out the duties of ownership
specified in this standard which are not assigned to the renting entity or lessee as
the user.
Summary of Contents for E190
Page 2: ......
Page 64: ...Hirschmann J1939 Install EEC 0110 V1 0 Hirschmann J1939 Network Installation...
Page 72: ...Hirschmann J1939 Install EEC 0110 V1 0 Hirschmann J1939 Network Installation...
Page 75: ...Hirschmann J1939 Install EEC 0110 V1 0 Hirschmann J1939 Network Installation...
Page 140: ......
Page 141: ......
Page 146: ...TITLE...
Page 147: ...TITLE...
Page 149: ...TITLE...
Page 150: ...TITLE...
Page 151: ...TITLE...
Page 152: ...TITLE...
Page 153: ......
Page 154: ......
Page 155: ......
Page 156: ......
Page 157: ...TITLE...
Page 158: ...TITLE...
Page 159: ...TITLE...
Page 160: ...TITLE...
Page 161: ...TITLE...
Page 162: ...TITLE...
Page 173: ...Bolt Torque EEC 0016 V1 2 Bolt Torque...
Page 179: ...Four Section Boom Operation aerial EEC 0081 V1 3 Four Section Boom Operation...
Page 199: ...Five Section Boom Operation aerial EEC 0080 V1 3 Five Section Boom Operation...
Page 227: ......
Page 230: ...1 INFORMAZIONI GENERALI GENERAL INFORMATION...
Page 248: ...8 ACCESSORI PER ARGANI DA SOLLEVAMENTO E TRAINO LIFTING AND RECOVERY WINCH ACCESSORIES...
Page 265: ...11 TABELLE DI CONVERSIONE CONVERSION TABLES...
Page 268: ...12 CONDIZIONI GENERALI DI VENDITA CONDITIONS OF SALE...
Page 279: ...4 5200S...
Page 280: ...5 6000S...
Page 333: ......
Page 334: ......
Page 357: ...Appendix B Parts Index ELLIOTT Built for You E190 Manual B 1...