Five Section Boom Operation-aerial EEC-0080
V1.3
Five Section Boom Operation
4
th
, use caution to keep 3/4/5 extend cables from damage as boom sections slide
apart, if possible keep tension on 3/4/5 extend cables from the base end of the 4
th
boom section during this procedure.
Y.
Lift 5
th
section off the lower pads and remove pads and hardware. Remove 3/4/5
extend sheaves and hardware.
Z.
Slide 5
th
section completely out of 4
th
. Support the base end of the 5
th
as it exits the
4
th
section boom. Place 5
th
section boom on a suitable horizontal surface.
AA.
Remove cable retainers and hardware from side anchor locations on the 5
th
section. Remove 3/4/5 extend and 5/4/3 retract cables from anchor points in the side
of the 5
th
section, place in suitable area to avoid damage.
BB.
Remove loadline sheaves by removing retainers and lightly tapping on sheave
pin while removing sheaves and spacers until All sheaves are removed from boom
sheave case.
Additional Maintenance, Disassembled Boom
A.
Clean all boom sections and inspect for wear, dents, bent or crooked boom sections,
gouged metal, broken welds or any abnormal conditions. Repair or replace as
required.
B.
Inspect all sheaves for excessive groove wear or abnormal rim wear. Replace as
required.
C.
Inspect all sheave bearings for excessive wear or cut inner liner material. If installed
bearing diameter is .015 inch (.38mm) larger than pin diameter, bearing must be
replaced. Any cut or gouge which causes the bearing liner to lose strands is cause
for bearing replacement.
D.
Clean and inspect all cable assemblies according to wire rope inspection procedures
in this section. Pay particular attention to any wire breakage at the end connections.
Replace cable assemblies as required. Lubricate all cable assemblies as required.
Lubricate all cable assemblies before reinstalling them in boom.
E.
Inspect all sheave pins for nicks, gouges or pitting due to rust in the bearing surface
area. Replace if any damage is evident.
Summary of Contents for E190
Page 2: ......
Page 64: ...Hirschmann J1939 Install EEC 0110 V1 0 Hirschmann J1939 Network Installation...
Page 72: ...Hirschmann J1939 Install EEC 0110 V1 0 Hirschmann J1939 Network Installation...
Page 75: ...Hirschmann J1939 Install EEC 0110 V1 0 Hirschmann J1939 Network Installation...
Page 140: ......
Page 141: ......
Page 146: ...TITLE...
Page 147: ...TITLE...
Page 149: ...TITLE...
Page 150: ...TITLE...
Page 151: ...TITLE...
Page 152: ...TITLE...
Page 153: ......
Page 154: ......
Page 155: ......
Page 156: ......
Page 157: ...TITLE...
Page 158: ...TITLE...
Page 159: ...TITLE...
Page 160: ...TITLE...
Page 161: ...TITLE...
Page 162: ...TITLE...
Page 173: ...Bolt Torque EEC 0016 V1 2 Bolt Torque...
Page 179: ...Four Section Boom Operation aerial EEC 0081 V1 3 Four Section Boom Operation...
Page 199: ...Five Section Boom Operation aerial EEC 0080 V1 3 Five Section Boom Operation...
Page 227: ......
Page 230: ...1 INFORMAZIONI GENERALI GENERAL INFORMATION...
Page 248: ...8 ACCESSORI PER ARGANI DA SOLLEVAMENTO E TRAINO LIFTING AND RECOVERY WINCH ACCESSORIES...
Page 265: ...11 TABELLE DI CONVERSIONE CONVERSION TABLES...
Page 268: ...12 CONDIZIONI GENERALI DI VENDITA CONDITIONS OF SALE...
Page 279: ...4 5200S...
Page 280: ...5 6000S...
Page 333: ......
Page 334: ......
Page 357: ...Appendix B Parts Index ELLIOTT Built for You E190 Manual B 1...