Required Inspections-aerial EEC-0075
V1.1
Required Inspections
H.
Inspect the wire rope for wear and damage, check for corrosion, kinking,
crushing, cuts, and slippage of clamps at wedge socket.
I.
Check for proper wire rope spooling on the winch drum and proper reeving. Make
sure all sheaves turn freely.
J.
Make sure the load line is correctly fastened to the hook block/headache ball.
K.
Make sure the hook block/headache ball latch works properly.
L.
Check slings, chains, etc. for damage or wear.
M.
Check that the Lift Capacity Charts and all other decals are in place and
readable.
N.
Check proper operation of all aerial device functions.
O.
Check boom proportioning. Verify all sections start and stop simultaneously.
P.
Check all control mechanisms for maladjustment that could interfere with proper
operation.
Q.
Verify that all control mechanisms when released to the neutral position all
functions stop.
R.
Make sure all control mechanisms are free of excessive wear and are not
contaminated by lubricants or other foreign matter.
S.
Check the hook block/headache ball for excessive wear and overload. Check for
cracks, spread side plates, elongated holes, bent tie bolts etc.
T.
Test the ATB system. With the engine running and PTO engaged, raise the ATB
weight and make sure the alarm sounds and the winch up, telescope out, and lift
down functions are disabled. Refer to the ATB manufacturer’s operator manual
for additional daily inspection procedures.
U.
Check proper operation of horn, start/stop switch, etc.
V.
If supplied, clean oil cooler core for proper heat transfer.
Be sure the unit is in an area free of overhead obstructions and power lines.
Weekly Inspection
A.
Perform the daily and weekly lubrication per the “Lube Chart”.
Summary of Contents for E190
Page 2: ......
Page 64: ...Hirschmann J1939 Install EEC 0110 V1 0 Hirschmann J1939 Network Installation...
Page 72: ...Hirschmann J1939 Install EEC 0110 V1 0 Hirschmann J1939 Network Installation...
Page 75: ...Hirschmann J1939 Install EEC 0110 V1 0 Hirschmann J1939 Network Installation...
Page 140: ......
Page 141: ......
Page 146: ...TITLE...
Page 147: ...TITLE...
Page 149: ...TITLE...
Page 150: ...TITLE...
Page 151: ...TITLE...
Page 152: ...TITLE...
Page 153: ......
Page 154: ......
Page 155: ......
Page 156: ......
Page 157: ...TITLE...
Page 158: ...TITLE...
Page 159: ...TITLE...
Page 160: ...TITLE...
Page 161: ...TITLE...
Page 162: ...TITLE...
Page 173: ...Bolt Torque EEC 0016 V1 2 Bolt Torque...
Page 179: ...Four Section Boom Operation aerial EEC 0081 V1 3 Four Section Boom Operation...
Page 199: ...Five Section Boom Operation aerial EEC 0080 V1 3 Five Section Boom Operation...
Page 227: ......
Page 230: ...1 INFORMAZIONI GENERALI GENERAL INFORMATION...
Page 248: ...8 ACCESSORI PER ARGANI DA SOLLEVAMENTO E TRAINO LIFTING AND RECOVERY WINCH ACCESSORIES...
Page 265: ...11 TABELLE DI CONVERSIONE CONVERSION TABLES...
Page 268: ...12 CONDIZIONI GENERALI DI VENDITA CONDITIONS OF SALE...
Page 279: ...4 5200S...
Page 280: ...5 6000S...
Page 333: ......
Page 334: ......
Page 357: ...Appendix B Parts Index ELLIOTT Built for You E190 Manual B 1...