ANSI/SIA Weather EEC-0036
V1.2
Responsibilities per
ANSI/SIA A92.2
the Qualification test requirements of
5.3.2
by either obtaining certification of the
test and performing a periodic test after installation, or by performing the
Qualification test.
F. Quality Assurance:
The installer shall have a documented quality assurance
program which will ensure compliance with this standard.
G. Welding:
All welds made by the installer, whose failure could result in motion of
the platform(s) shall meet the
Structural Welding Code AWS DI.I-98 and AWS
DI.2-98
. The installer shall establish applicable welding quality assurance
procedures for all weldments.
H. Training:
The dealer or installer shall offer training or training materials that aid
owners and users in the operation, inspection, testing and maintenance of the
aerial device. This training shall be offered initially and subsequently on request.
I. Dealer or Installer as Use
r
:
Whenever a dealer or installer directs personnel to
operate an aerial device (inspecting, sales demonstrations, or any form of use),
the dealer or installer shall assume the responsibilities of users as specified in
Section 9 of this standard. All personnel authorized to operate the aerial device
shall have been trained.
Responsibilities of Owners
A. General Responsibilities:
Each owner shall comply with the requirements of
this section. The following responsibilities pertain to the owner’s inspection,
testing, maintenance, modification, training, and transfer of ownership. These
activities shall be performed by qualified person(s).
B. Inspection and Testing Classifications
1. Initial Inspection and Test:
Prior to initial use, all new or modified mobile
units shall be inspected and tested to ensure compliance with the provisions
of this standard. Verification by the manufacturer, the installer or an
equivalent entity(s), meets this requirement.
2. Regular Inspection and Tests:
The inspection procedure for mobile units is
divided into two classifications based upon the intervals at which inspections
and tests shall be performed. Intervals shall be set by the owner in
Summary of Contents for E190
Page 2: ......
Page 64: ...Hirschmann J1939 Install EEC 0110 V1 0 Hirschmann J1939 Network Installation...
Page 72: ...Hirschmann J1939 Install EEC 0110 V1 0 Hirschmann J1939 Network Installation...
Page 75: ...Hirschmann J1939 Install EEC 0110 V1 0 Hirschmann J1939 Network Installation...
Page 140: ......
Page 141: ......
Page 146: ...TITLE...
Page 147: ...TITLE...
Page 149: ...TITLE...
Page 150: ...TITLE...
Page 151: ...TITLE...
Page 152: ...TITLE...
Page 153: ......
Page 154: ......
Page 155: ......
Page 156: ......
Page 157: ...TITLE...
Page 158: ...TITLE...
Page 159: ...TITLE...
Page 160: ...TITLE...
Page 161: ...TITLE...
Page 162: ...TITLE...
Page 173: ...Bolt Torque EEC 0016 V1 2 Bolt Torque...
Page 179: ...Four Section Boom Operation aerial EEC 0081 V1 3 Four Section Boom Operation...
Page 199: ...Five Section Boom Operation aerial EEC 0080 V1 3 Five Section Boom Operation...
Page 227: ......
Page 230: ...1 INFORMAZIONI GENERALI GENERAL INFORMATION...
Page 248: ...8 ACCESSORI PER ARGANI DA SOLLEVAMENTO E TRAINO LIFTING AND RECOVERY WINCH ACCESSORIES...
Page 265: ...11 TABELLE DI CONVERSIONE CONVERSION TABLES...
Page 268: ...12 CONDIZIONI GENERALI DI VENDITA CONDITIONS OF SALE...
Page 279: ...4 5200S...
Page 280: ...5 6000S...
Page 333: ......
Page 334: ......
Page 357: ...Appendix B Parts Index ELLIOTT Built for You E190 Manual B 1...