Five Section Boom Operation-aerial EEC-0080
V1.3
Five Section Boom Operation
3/2/1 Retract Cable (Qty 2):
Connects to the front of the 1st (Main) section and
passes over sheave at back of 2nd (Next to Large) Section and Connects to Back of
3rd (Mid) Section. Primary function of these cables is to retract the 3rd (Mid) Section.
4/3/2 Retract Cable (Qty 2):
Connects to the front of the 2nd (Next to Large) section
and passes over sheave at back of 3rd (Mid) Section and Connects to Back of 4th
(Next to Tip) Section. Primary function of these cables is to retract the 4th (Next to
Tip) Section.
5/4/3 Retract Cable (Qty 2):
Connects to the front of the 3rd (Mid) section and
passes over sheave at back of 4th (Next to Tip) Section and Connects to Back of 5th
(Tip) Section. Primary function of these cables is to retract the 5th (Tip) Section.
3/4/5 Extend Cable (Qty 2):
Connects to the back of the 3rd (Mid) section and
passes over sheave at front of 4th (Next to Tip) Section and Connects to Back of 5th
(Tip) Section. Primary function of these cables is to extend the 5th (Tip) Section.
2/3/4 Extend Cable (Qty 3):
Connects to the back of the 2nd (Next to Large) section
and passes over sheave on the extension cylinder and Connects to Back of 4th
(Next to Tip) Section. Primary function of these cables is to extend the 4th (Next to
tip) Section.
1/2/3 Extend Cable/ Proportioning Cable (Qty 2):
Connects to the back of the 1st
(Main) section and passes over sheave at front (on top) of 2nd (Next to Large)
Section and Connects to Back of 3rd (Mid) Section. Primary function of these
cables is to synchronize the telescope cylinder/boom.
Extension Cylinder - Two Stage (Qty 1):
Connects to the back of the 1st (Main)
section, Back of the 2nd (Next to Large), and 3rd (Mid) Sections. Primary Function
of the cylinder is to extend & retract the sections 1, 2 & 3 (Main, Next to Large, &
Mid).
Summary of Contents for E190
Page 2: ......
Page 64: ...Hirschmann J1939 Install EEC 0110 V1 0 Hirschmann J1939 Network Installation...
Page 72: ...Hirschmann J1939 Install EEC 0110 V1 0 Hirschmann J1939 Network Installation...
Page 75: ...Hirschmann J1939 Install EEC 0110 V1 0 Hirschmann J1939 Network Installation...
Page 140: ......
Page 141: ......
Page 146: ...TITLE...
Page 147: ...TITLE...
Page 149: ...TITLE...
Page 150: ...TITLE...
Page 151: ...TITLE...
Page 152: ...TITLE...
Page 153: ......
Page 154: ......
Page 155: ......
Page 156: ......
Page 157: ...TITLE...
Page 158: ...TITLE...
Page 159: ...TITLE...
Page 160: ...TITLE...
Page 161: ...TITLE...
Page 162: ...TITLE...
Page 173: ...Bolt Torque EEC 0016 V1 2 Bolt Torque...
Page 179: ...Four Section Boom Operation aerial EEC 0081 V1 3 Four Section Boom Operation...
Page 199: ...Five Section Boom Operation aerial EEC 0080 V1 3 Five Section Boom Operation...
Page 227: ......
Page 230: ...1 INFORMAZIONI GENERALI GENERAL INFORMATION...
Page 248: ...8 ACCESSORI PER ARGANI DA SOLLEVAMENTO E TRAINO LIFTING AND RECOVERY WINCH ACCESSORIES...
Page 265: ...11 TABELLE DI CONVERSIONE CONVERSION TABLES...
Page 268: ...12 CONDIZIONI GENERALI DI VENDITA CONDITIONS OF SALE...
Page 279: ...4 5200S...
Page 280: ...5 6000S...
Page 333: ......
Page 334: ......
Page 357: ...Appendix B Parts Index ELLIOTT Built for You E190 Manual B 1...