IM02601006E www.eaton.com 3-6
IQ 150S/250S 3: Mechanical Installation
3.3: Secure the Cover
1. Close the cover, making sure that power and communications wires exit the submeter through
the openings at the base (see Figure 3.6).
CAUTION!
To avoid damaging components on the board assembly, make sure the front cover
support is in the upright position before closing the front cover.
2. Using the 3 enclosed screws, secure the cover to the base in three places - DO NOT over-
tighten (you may damage the cover). Maximum recommended torque is
0.5/0.6 Nm (4.42/5.31 lbF in).
3. The unit can be sealed after the front cover is closed. To seal the unit, thread a seal tag (not
supplied by Eaton) through the housing located between the bottom access holes (see figures
3.6 and 3.7).
4. Reattach the antenna, if applicable.
Figure 3.7: Submeter with Closed Cover
Closed
Lockable Revenue Seal
Screw
Summary of Contents for IQ 150S
Page 4: ......
Page 14: ...IM02601006E www eaton com 1 4 IQ 150S 250S 1 Introduction This page intentionally left blank...
Page 93: ...IM02601006E www eaton com 5 43 IQ 150S 250S 5 Communication XY Graph Advanced Graph...
Page 116: ...IM02601006E www eaton com 5 66 IQ 150S 250S 5 Communication This page intentionally left blank...
Page 192: ...IQ 150S B Modbus Map IM02601006E www eaton com MM 10 This page intentionally left blank...
Page 208: ...IQ 250S B Modbus Map IM02601006E www eaton com MM 16 This page intentionally left blank...
Page 222: ...IM02601006E www eaton com C 14 IQ 150S C DNP Map This page intentionally left blank...
Page 234: ...IM02601006E www eaton com D 10 IQ 250S D DNP Map This page intentionally left blank...