IM02601006E www.eaton.com 3-2
IQ 150S/250S 3: Mechanical Installation
CAUTIONS!
• Remove the antenna before opening the unit.
• Only use the front cover support if you are able to open the front cover to the extent that you can
fit the front cover support into its base.
DO NOT
rest the front cover support on the inside of the
meter, even for a short time - by doing so, you may damage components on the board assem-
bly. Always insert the front cover support into its base.
3. Find the 4 Installation Slots and insert screws through each slot into the wall or panel.
4. Fasten securely - DO NOT overtighten. Maximum recommended torque is
0.5/0.6 Nm (4.42/5.31 lbF in).
3.2.1:Mounting Diagrams
Figure 3.2: Mounting Plate Dimensions
-/5.4).'0,!4%
v
CM
v
CM
v
CM
v
CM
v
CM
Summary of Contents for IQ 150S
Page 4: ......
Page 14: ...IM02601006E www eaton com 1 4 IQ 150S 250S 1 Introduction This page intentionally left blank...
Page 93: ...IM02601006E www eaton com 5 43 IQ 150S 250S 5 Communication XY Graph Advanced Graph...
Page 116: ...IM02601006E www eaton com 5 66 IQ 150S 250S 5 Communication This page intentionally left blank...
Page 192: ...IQ 150S B Modbus Map IM02601006E www eaton com MM 10 This page intentionally left blank...
Page 208: ...IQ 250S B Modbus Map IM02601006E www eaton com MM 16 This page intentionally left blank...
Page 222: ...IM02601006E www eaton com C 14 IQ 150S C DNP Map This page intentionally left blank...
Page 234: ...IM02601006E www eaton com D 10 IQ 250S D DNP Map This page intentionally left blank...