Electrical system
203
●
Integral type;
●
Wheel metal disc;
Methods for installing different ballast
➢
Cast iron "box-shaped" blocks
This kind of ballast can be installed by one worker. The ballast shall be placed on the front bracket for installation.
Danger:
Please make sure to check the weight of each ballast. If it weighs more than the bearable limit (male: 30
kg, female: 20 kg), please use appropriate mechanical lifting devices.
➢
Bolted cast iron pieces
Such ballast must be installed by at least two workers – One undertakes to lift the ballast up in place while the other
uses bolts to fix the ballast.
Danger:
Please make sure to check the weight of each ballast. If it weighs more than the bearable limit (male: 30
kg, female: 20 kg), please use appropriate mechanical lifting devices.
➢
Intermediate plate
The intermediate plate must be installed by at least two workers – One undertakes to lift up in place while the other
uses bolts to fix the load block.
Danger:
Please make sure to check the weight of each load. If it weighs more than the bearable limit (male: 30
kg, female: 20 kg), please use appropriate mechanical lifting devices.
➢
Ballast block
Each ballast block must be installed by at least two workers, with the specific operation steps as follows:
●
Lower the front lift arm;
●
Drive the tractor forward slowly to the ballast;
●
Raise the lift arm until the hooked hanger has engaged with the lateral positioning pin;
●
Use pins to connect the upper link and the huge rock.
Summary of Contents for FL35-70HP Series
Page 21: ...Product Mark 20 1 Security Considerations ...
Page 57: ...Product Mark 56 Fig 1 35 Fig 1 36 ...
Page 58: ...Product Mark 57 Fig 1 37 Fig 1 38 ...
Page 70: ...69 2 Product Mark ...
Page 74: ...73 Page Left Intentionally Blank ...
Page 75: ...Product Description 74 3 Product Description ...
Page 77: ...Product Description 76 Fig 3 2 3 1 2 Appearance of tractor equipped with cab ...
Page 81: ...Product Description 80 ...
Page 113: ...Product Description 112 ...
Page 124: ...Electrical system 123 4 Operation Instructions ...
Page 157: ...Electrical system 156 ...
Page 162: ...Electrical system 161 Fig 4 32 Three point linkage Model 2 ...
Page 189: ...Electrical system 188 5 Wheels ...
Page 208: ...Electrical system 207 6 Electrical System ...
Page 230: ...Electrical system 229 requirements 6 6 Electrical Schematic Diagram ...
Page 235: ...234 7 On board Spare Parts Tools and Quick wear Parts ...
Page 241: ...240 ...
Page 242: ...241 8 Maintenance Specification ...
Page 288: ...287 Fig 8 35 ...
Page 338: ...Operation Instructions 337 9 Troubleshooting ...
Page 353: ...352 10 Tractor Storage and Unpack ...
Page 358: ...Tractor Storage and Unpack 357 11 Delivery Acceptance and Transportation ...
Page 361: ...360 ...
Page 362: ...361 12 Disassembly and Disposal ...
Page 365: ...Warranty Contents 364 13 Warranty Contents ...
Page 411: ...Appendix 410 15 Appendix ...