3
|
Components
Service manual
346
REYQ8~20+REMQ5U7Y1B
VRV IV+ Heat Recovery
ESIE18-15B – 2020.05
Is the problem solved?
Action
No
continue with the next procedure.
To remove the Sub PCB
Prerequisite:
Stop the unit operation via the central controller.
Prerequisite:
Turn OFF the respective circuit breaker.
1
Remove the required plate work, see
315].
DANGER: RISK OF ELECTROCUTION
Confirm the rectifier voltage is below 10 V DC before proceeding, see
2
Locate the Sub PCB.
3
Disconnect all connectors from the Sub PCB.
4
Carefully pull the Sub PCB at the side and unlatch the PCB supports one by
one using a small pair of pliers.
a
a
a
a
a
a
a
PCB support
5
Remove the Sub PCB from the unit.
6
To install the Sub PCB
1
Install the Sub PCB on its correct location.
2
Latch the PCB supports to fix the Sub PCB.
a
a
a
a
a
a
a
PCB support
3
Connect all connectors to the Sub PCB.
Is the problem solved?
Action
Yes
No further actions required.
No
continue with the next procedure.
Summary of Contents for VRV IV+
Page 473: ......
Page 474: ......
Page 475: ......
Page 476: ...ESIE18 15B 2020 05 Copyright 2020 Daikin Verantwortung für Energie und Umwelt ...