3
|
Components
Service manual
292
REYQ8~20+REMQ5U7Y1B
VRV IV+ Heat Recovery
ESIE18-15B – 2020.05
Is the correct spare part for the main
PCB installed?
Action
Yes
and continue with the next procedure.
No
Replace the main PCB,
To check the wiring of the main PCB
Prerequisite:
First perform all earlier checks of the main PCB, see
Prerequisite:
Stop the unit operation via the central controller.
Prerequisite:
Turn OFF the respective circuit breaker.
1
Check that all wires are properly connected and that all connectors are fully
plugged‑in.
2
Check that no connectors or wires are damaged.
3
Check that the wiring corresponds with the wiring diagram, see
385].
4
Check that the bridge connector X4A is plugged in, see
385].
INFORMATION
Correct the wiring as needed.
Is the problem solved?
Action
Yes
No further actions required.
No
and continue with the next procedure.
To check the fuses of the main PCB
Prerequisite:
First perform all earlier checks of the main PCB, see
1
Measure the continuity of the fuse. If no continuity is measured, the fuse has
blown.
a
a
a
Fuse
Any blown fuses on the main PCB?
Action
Yes
Replace the blown fuse(s), see