3
|
Components
Service manual
265
REYQ8~20+REMQ5U7Y1B
VRV IV+ Heat Recovery
ESIE18-15B – 2020.05
a
a
b
a
Cable clamp
b
Fan connector X1A
8
Connect fan connector X1A.
9
Reinstall the cable clamp.
Is the problem solved?
Action
Yes
No further actions required.
No
Return to
259] of the fan inverter
PCB and continue with the next
procedure.
3.8.2 Double fan outdoor unit
Checking procedures
INFORMATION
It is recommended to perform the checks in the listed order.
To perform a power check of the fan inverter PCB
Prerequisite:
Stop the unit operation via the central controller.
Prerequisite:
Turn OFF the respective circuit breaker.
Prerequisite:
Remove the required plate work, see
Prerequisite:
315].
1
Turn ON the power of the unit.
2
Measure the voltage between pins 1 and 3 of connector X5A The measured
voltage MUST be 18 V DC.
Summary of Contents for VRV IV+
Page 473: ......
Page 474: ......
Page 475: ......
Page 476: ...ESIE18 15B 2020 05 Copyright 2020 Daikin Verantwortung für Energie und Umwelt ...