3
|
Components
Service manual
228
REYQ8~20+REMQ5U7Y1B
VRV IV+ Heat Recovery
ESIE18-15B – 2020.05
(12.3 N·m)
(12.3 N·m)
1
1
4
4
2
2
2
2
5
5
3
3
6
6
7
7
a
b
d e c
To remove the compressor insulation
Prerequisite:
Stop the unit operation via the central controller.
Prerequisite:
Turn OFF the respective circuit breaker.
Prerequisite:
Remove the required plate work, see
315].
1
Detach all the strips (a).
a
a
a
a
a
Strip
2
Detach the strip (b) of the top jacket (c).
3
Remove the top jacket (c).
4
Remove the body jacket (d) from the compressor (e).
b
c
e
d
b
Strip
c
Top jacket
Summary of Contents for VRV IV+
Page 473: ......
Page 474: ......
Page 475: ......
Page 476: ...ESIE18 15B 2020 05 Copyright 2020 Daikin Verantwortung für Energie und Umwelt ...