3
|
Components
Service manual
289
REYQ8~20+REMQ5U7Y1B
VRV IV+ Heat Recovery
ESIE18-15B – 2020.05
23
Install the screws (a) to fix the power terminal assembly (b).
For double fan units
24
Clean the heat sink surface and apply a thin layer of heat sink compound to
the heat sink surface.
25
Install the inverter PCB on its correct location.
26
Latch the PCB supports (c) to fix the PCB.
27
Install and tighten the 2 screws (d) to fix the inverter PCB to the heat sink
plate.
a
b
a
b
b
b b b
b
b
c
c
c
c
c
c
c
a
a
c
d
d
a
Connector
b
Connector
c
PCB support
d
Screw
28
Install the 4 screws (e) that fix the heat sink (f) to the switch box.
e
f
e
e
e
e
f
e
e
e
e
Screw
f
Heat sink
29
Connect all connectors (a) to the inverter PCB.
30
Connect the wire terminals (b) to the inverter PCB.
Is the problem solved?
Action
Yes
No further actions required.
No
Return to
274] of the inverter PCB
and continue with the next procedure.
Summary of Contents for VRV IV+
Page 473: ......
Page 474: ......
Page 475: ......
Page 476: ...ESIE18 15B 2020 05 Copyright 2020 Daikin Verantwortung für Energie und Umwelt ...