background image

EN 13241
EN 12453
EN 12445

APROLI 380 LB

Oil-hydraulic operator for bi-parting double folding doors

APROLI 380 LB 

LEFT-HAND

APROLI 380 LB 

RIGHT-HAND

   1 - 12

GB

Instructions Manual

pages

the gate opener

istr_aproli380lb_GB.ai   1   25/10/2018   17:11:22

Summary of Contents for APROLI 380 LB

Page 1: ...EN 13241 EN 12453 EN 12445 APROLI 380 LB Oil hydraulic operator for bi parting double folding doors APROLI 380 LB LEFT HAND APROLI 380 LB RIGHT HAND 1 12 GB Instructions Manual pages the gate opener ...

Page 2: ...ning about the presence of an automated installation The installer must inform and instruct the end user about the proper use of the system by releasing him a technical dossier including layout and components of the installation risk analysis verification of safety accessories verification of impact forces and reporting of residual risks INFORMATION FOR END USERS The end user is required to read c...

Page 3: ...tall by means of a support bracket made of zinc coated steel and to be fixed by expanding bolts the operator assembly in zinc coated steel and aluminium is designed to fit into it and be fastened by screws The movement shaft is made of hardened steel to ensure reliability and last longer over the time The movement arm system cosists of a bar sliding into a tubular casing both made of zinc coated s...

Page 4: ...hand 5 Miri 4 flasher with aerial 6 Chis 37 key switch 7 Trifo 11 photocell receiver 8 Trifo 11 photocell projector 9 VIX 53 radio transmitter 230 V 50 Hz 10 4x1 5 mm Pic 2 Indicative general layout it is the installer s care and responsibility to lay the tubes for the connections in the most suitable way English 2 3 4 1 7 8 9 4 4x1 mm 4x1 mm 2x1 mm 5 6 2x1 mm RG58 4x1 mm 4x1 mm Oil hydraulic oper...

Page 5: ... 3 Pic 4 Adjustment pressure valves Rotation shaft Release lever English 5 NOTE WELL depending on which panel Aproli 380 LB is installed either panel 1 or 2 the operator handing version right or left changes as indicated in Pic 4 APROLI 380 LB LEFT HAND Panel 1 Panel 1 Panel 2 Panel 2 APROLI 380 LB LEFT HAND APROLI 380 LB RIGHT HAND APROLI 380 LB RIGHT HAND Panel 1 Panel 1 Panel 2 Panel 2 Oil hydr...

Page 6: ...ors The measurements in the table are such to provide a proper coupling allowing the movement of the doors Pic 5 Pic 6 Aproli 380 LB installed on panel 2 Aproli 380 LB installed on panel 1 60 60 40 English 6 L1 L2 L Installation measurements mm 1 000 750 750 1 100 800 800 1 200 900 900 1 500 1 200 1 200 door L L1 L2 Installation measurements mm 1 000 550 550 670 1 100 550 550 670 1 200 550 550 680...

Page 7: ... block to be able to connect the power supply cables Pic 9 The bar and tube of the telescopic arm are required to be cut to L1 and L2 measurements It is important that the sliding bar be cut shortened so that the end with rounded corners be preserved to facilitate sliding into the tubular element Pic 7 Pic 7 Pic 8 Pic 9 English 7 L1 L2 Should the motor shaft turn in the wrong direction connect to ...

Page 8: ...re holed ferrule to the motor shaft and fasten it by the retaining pin matching the hole in the shaft After rotating the ferrule 5 at least in the direction indicated in Pic 10 weld the sliding bar on to the top of it making sure the bar and the shaft hole are aligned in the direction of the wall fixing plate Pic 11 Pic 11 Pic 10 English NOTE WELL protect Aproli 380 LB while welding Stop plate in ...

Page 9: ...ments one in opening red screw and one in closing green screw Pic 12 RELEASING FOR MANUAL OPERATIONS The operator can be released for manual operations by a lever positioned under the bottom side Pic 13 Pic 12 Pic 13 English Tighten hard Pressure adjustment valves Rotation shaft 9 Oil hydraulic operator for bi parting double folding doors APROLI 380 LB ...

Page 10: ...English 10 Oil hydraulic operator for bi parting double folding doors APROLI 380 LB ...

Page 11: ...perator model Dimensions per gate leaf Weight per gate leaf Installation date Quantity of models installed Maintainer Date NOTE WELL this document must record any ordinary and extraordinary services including installation maintenance repairs and replacements to be made only by using Fadini original spare parts This document for the data included in it must be made available to authorized inspector...

Page 12: ...cessories 16 kg Max gate weight for double folding doors 250 kg Protection standard IP 67 40 C with specific optional accessories Ref General Catalogue PERFORMANCE Frequency of use intensive Service cycle opening 23 s dwell 30 s closing 23 s dwell 30 s Complete cycle time 106 s Complete cycles opening dwell closing dwell No 34 hour Annual cycles with 8 hours of use per day No 99 280 ELECTRIC MOTOR...