3
|
Components
Service manual
344
REYQ8~20+REMQ5U7Y1B
VRV IV+ Heat Recovery
ESIE18-15B – 2020.05
2
Enter the model name of your unit and check if the installed spare part
number corresponds with the spare part number indicated in the webbank.
Is the correct spare part for the Sub
PCB installed?
Action
Yes
continue with the next procedure.
No
Replace the Sub PCB, see
To check the wiring of the Sub PCB
Prerequisite:
First perform all earlier checks of the Sub PCB, see
Prerequisite:
Stop the unit operation via the central controller.
Prerequisite:
Turn OFF the respective circuit breaker.
1
Check that all wires are properly connected and that all connectors are fully
plugged‑in.
2
Check that no connectors or wires are damaged.
3
Check that the wiring corresponds with the wiring diagram, see
385].
INFORMATION
Correct the wiring as needed.
Is the problem solved?
Action
Yes
No further actions required.
No
continue with the next procedure.
To check the fuse of the Sub PCB
Prerequisite:
First perform all earlier checks of the Sub PCB, see
1
Measure the continuity of the fuse. If no continuity is measured, the fuse has
blown.
a
a
Fuse
Blown fuse on the Sub PCB?
Action
Yes
Replace the blown fuse, see
Summary of Contents for VRV IV+
Page 473: ......
Page 474: ......
Page 475: ......
Page 476: ...ESIE18 15B 2020 05 Copyright 2020 Daikin Verantwortung für Energie und Umwelt ...