3
|
Components
Service manual
320
REYQ8~20+REMQ5U7Y1B
VRV IV+ Heat Recovery
ESIE18-15B – 2020.05
To remove the front plate
b
a
a
a
a
a
a
a
a
Screw
b
Front plate
6
Loosen and remove the 7 screws (a) that fix the front plate assembly.
7
Lift the front plate assembly (b) and remove it from the unit.
To remove the switch box cover
DANGER: RISK OF ELECTROCUTION
Wait for at least 10 minutes after the circuit breaker has been turned OFF, to be sure
the rectifier voltage is below 10 V DC before proceeding.
b
a
a
a
Screw
b
Switchbox cover
8
Loosen and remove the 2 screws (a) that fix the switchbox cover.
9
Remove the switchbox cover (b) from the unit.
Summary of Contents for VRV IV+
Page 473: ......
Page 474: ......
Page 475: ......
Page 476: ...ESIE18 15B 2020 05 Copyright 2020 Daikin Verantwortung für Energie und Umwelt ...