background image

Technical Manual

English

Color Controller C-80 

Powered by Creo Color Server Technology

for Pro C900

 

734-00932A-EN  

Version 1.0

Summary of Contents for Color Controller C-80

Page 1: ...Technical Manual English Color Controller C 80 Powered by Creo Color Server Technology for Pro C900 734 00932A EN Version 1 0...

Page 2: ......

Page 3: ...n advised of the possibility of such damages resulting from i the use or the inability to use the product or software ii the cost of procurement of substitute goods and services resulting from any pro...

Page 4: ...didate list according to article 59 1 of Regulation EC No 1907 2006 REACH CE Marking Traceability Information For EU Countries Only Manufacturer Kodak IL LTD P O Box 10193 Petach Tikva 49002 Israel Au...

Page 5: ...de seguran a xii Seguran a geral xii Troca de bateria xii Eletricidade est tica xii 1 Product Overview 1 1 1 Introduction 2 1 1 1 Color Controller C 80 Components 2 1 1 2 Functionality and Features 3...

Page 6: ...ls Overview 48 4 1 2 Using the Configuring Tools 50 4 2 General Diagnostic Tools 58 4 2 1 PC Health Monitoring 58 4 2 2 POST Power On Self Test 59 4 3 Color Controller C 80 Hardware Diagnostics Softwa...

Page 7: ...stalling the DVD RW Drive 119 5 8 Replacing a Hard Disk 119 5 8 1 Removing a Hard Disk 120 5 8 2 Installing a Hard Disk 120 5 9 Replacing the Power Supply 121 5 9 1 Removing the Power Supply 121 5 9 2...

Page 8: ...vi Color Controller C 80 1 0 Technical Manual...

Page 9: ...ormation Multi Language Safety Precautions vi Sicherheitsma nahmen vii Medidas Preventivas de Seguridad viii Mesures de s curit ix Precauzioni di Sicurezza x Veiligheidsmaatregelen xi Precau es de seg...

Page 10: ...me circuits energized For complete disconnection from the supply the main power cable must also be disconnected from the power source Battery Replacement Only qualified service personnel should replac...

Page 11: ...ert Um eine vollst ndige Trennung von der Stromversorgung zu erreichen muss der Hauptlastschalter von der Stromquelle getrennt sein Batterieaustausch Die Batterie sollte nur von qualifiziertem Kundend...

Page 12: ...n completa del suministro de energ a el cable de alimentaci n principal se debe desconectar de la fuente de alimentaci n Sustituci n de la bater a S lo un ingeniero de mantenimiento y reparaciones deb...

Page 13: ...alimentation en courant le c ble d alimentation principale doit aussi tre d connect du bloc d alimentation Remplacement de la batterie Le remplacement de la batterie est une op ration r serv e au per...

Page 14: ...una sconnessione completa dalle fonti di alimentazione il cavo di alimentazione principale deve essere staccato dal connettore di alimentazione Sostituzione della Batteria La batteria dovrebbe essere...

Page 15: ...tscircuits geactiveerd blijven Om de stroomtoevoer volledig af te sluiten moet de electriciteitskabel uit het stopkontact zijn De batterij vervangen De batterij mag alleen door bevoegd servicepersonee...

Page 16: ...dos Para uma desconex o completa da fonte de alimenta o o cabo de alimenta o principal tamb m deve ser desconectado da fonte de alimenta o Troca de bateria A bateria deve ser substitu da somente por u...

Page 17: ...1 Product Overview Introduction 2 Product Configuration 4...

Page 18: ...tions The Color Controller C 80 processes files in PDL for example PostScript PDF and VDP formats converting them into a suitable ready to print format for direct high quality printing The Color Contr...

Page 19: ...Post RIP imposition Job management On screen preview and editing Print jobs at machine rated speed RIP Adobe Postscript Level 3 and Extreme certified technologies Ready to print job format for immedia...

Page 20: ...disk 250GB hard disk Windows XP Professional loaded on C Default Windows based computer and Macintosh shared folder including various utilities and PPD on D Default path for APR high resolution files...

Page 21: ...D Gigabit ethernet connection Enables high speed connection to the network 1 1 5 Disk Configuration The following table outlines the Color Controller C 80 disk configuration Disk 0 C Windows XP Profes...

Page 22: ...6 Chapter 1 Product Overview...

Page 23: ...2 First Time Setup and Configuration Connecting the Color Controller C 80 8 Configuration Wizard First time Software Setup 11 Configuring McAfee VirusScan 29...

Page 24: ...he printer display panel press Clear Modes 2 Type 107 and press C Clear until the SP mode appears 3 Touch System Sp 4 Use the buttons on the touch screen to navigate to the SP5193 001 setting External...

Page 25: ...on the printer Figure 3 Printer and Color Controller C 80 connection Note To prevent the risk of crosstalk make sure the printer interface cable does not touch the system s power cables The Color Cont...

Page 26: ...s before pressing the power control button on the Color Controller C 80 see Figure 4 on page 10 The ON OFF LED on the front panel illuminates a steady green After the system startup is complete the Wi...

Page 27: ...he Color Controller C 80 for the first time the Configuration Wizard appears The first time software setup is performed using the Configuration Wizard 2 2 1 Choosing the Configuration Type Verify that...

Page 28: ...e of the Color Controller C 80 is created automatically during the factory installation To change the computer name check with your system administrator 1 In the Server name area verify that the corre...

Page 29: ...lick OK Setting the Date and Time 1 In the Date Time tab verify that the date and time are set correctly If they are correct proceed to Configuring the Network Setup on page 14 2 If you want to change...

Page 30: ...twork Setup Configuring TCP IP Addresses 1 In the TCP IP area verify that the IP address is correct If it is correct proceed to Configuring the IPv6 Address on page 15 If the IP address is not correct...

Page 31: ...applicable 4 Click OK 5 In the Local Area Connection Properties dialog box click OK Configuring the IPv6 Address 1 In the IPv6 Address area verify that the address is correct 2 If it is correct proce...

Page 32: ...r Configuring the AppleTalk Zone This option enables you to change the AppleTalk network zone in which your Color Controller C 80 appears 1 In the Apple Talk setup area verify that the displayed Apple...

Page 33: ...ed zone and click OK 3 In the Local Area Connection Properties dialog box click OK 2 2 4 Configuring the Remote Tools Setup The WebViewer provides server information and enables you to view the status...

Page 34: ...hours 4 Click Remote Connections Viewer to view the remote connections 2 2 5 Configuring Security Settings Using the Default Password Settings Note The factory default password for Administrator and O...

Page 35: ...k Wipe Setting The Disk Wipe utility enables you to work in a more secure environment by permanently removing data left by files that you have deleted The utility eliminates the contents of your delet...

Page 36: ...e of the following options If the disk space is correct proceed to the next screen in the wizard If you need to change the amount of free disk space enter the correct minimum disk space that you requi...

Page 37: ...d in the path box If the backup is made to external media the displayed path is the default C ColorControllerC 80 General Configuration 2 2 8 Setting the Calibration Reminder Set the calibration remin...

Page 38: ...Parameters You configure the measurement unit and language in the Localization window 1 In the Units list select the required default measurement unit 2 In the Language list select the required inter...

Page 39: ...lect one of the following After 30 days After 12 hours Then enter the desired number of days or hours Note Change the number of days or hours depending on your site requirements 2 In the Held jobs are...

Page 40: ...1 In the PostScript preview area specify the desired action when you close the Adobe Acrobat preview window Save file as PDF Return to the original PostScript file 2 In the VDP jobs preview area sele...

Page 41: ...ing jobs that have similar attributes and enable the printer to pause in between printing jobs Held Jobs Policy In the Held jobs policy area do one of the following Select Bypass held jobs to bypass h...

Page 42: ...erent than 90 days 2 In the Message viewer log setup area enter the number of days after which you can overwrite messages if different than 90 days 2 2 14 Configuring JDF Output and JMF Signals The Co...

Page 43: ...rea select the Send JMF signals check box to receive JMF signals about the job s status 4 In the HTTP URL box type HTTP URL This enables you to submit JMF signals with the job status each time that th...

Page 44: ...e when printing via LPR Uses the job s given file name Selecting this option ensures that the job appears in the Color Controller C 80 with the name last given by the user Cached global VDP elements S...

Page 45: ...the following configuration procedures Once a year the site manager must obtain the latest version of the antivirus software and installation procedure The site manager must also regularly download th...

Page 46: ...First Time Setup and Configuration 4 In the What not to scan area click Exclusions 5 Click Add 6 Click Browse 7 In the Browse for Folder dialog box locate the D Output folder and click OK The D Output...

Page 47: ...ct the Also exclude subfolders check box and click OK 9 In the Set Exclusions dialog box click OK and then click OK again 2 3 2 Configuring the On Access Scan Settings 1 Return to the VirusScan Consol...

Page 48: ...2 Chapter 2 First Time Setup and Configuration 2 In the Task area right click On Access Scanner and select Properties 3 On the left of the window click the All Processes icon 4 Select the Detection ta...

Page 49: ...ons 6 In the Set Exclusions dialog box click Add 7 Click Browse 8 In the Browse for Folder dialog box locate the D Output folder and click OK 9 Select the Also exclude subfolders check box and click O...

Page 50: ...orage area Note If the job does not print or is waiting in the Print Queue make sure that the default virtual printer parameters are set to the current finishing device Job Parameters Finishing To imp...

Page 51: ...lor problems On the printer control panel enter the SP mode and then execute the process control with SP3 820 002 For density difference problems Perform color calibration on the Color Controller C 80...

Page 52: ...36 Chapter 2 First Time Setup and Configuration...

Page 53: ...3 Reinstalling the Color Controller C 80 Software When To Reinstall 38 Installing the Operating System and Software 39 Backing Up the System Partition 42 Restoring the System Partition 44...

Page 54: ...ically replacing the system disk When upgrading the system disk Preservation Installation System Partition Overwrite This procedure requires two discs DVD 1 and DVD 2 It installs the Color Controller...

Page 55: ...ng information is available for the Color Controller C 80 Computer name TCP IP information Gateway WINS address and DNS information if DHCP is not active on site AppleTalk zone information IPX informa...

Page 56: ...the option you want to perform Press 1 to perform a complete installation Press 2 to perform preservation installation The confirmation message Are you sure appears 4 Press y Yes to confirm your selec...

Page 57: ...window opens click Yes to continue the Color Controller C 80 installation 13 When the installation is complete a Click Finish to restart the computer b Remove DVD 2 from the DVD RW drive When the appl...

Page 58: ...3 to use the System Backup Tool 6 Type Y to confirm your selection The System Backup Restore Tool menu appears Attention Before performing the backup and restore procedures make sure that your comput...

Page 59: ...DVD for the backup a Press Y to continue The following message appears b To continue press Y The following message appears c Follow the instructions in the message Norton Ghost copies the files on pa...

Page 60: ...Restart OK After the system restarts the Color Controller C 80 Startup Menu appears The following options are available 4 Press 3 to use the System Backup Restore Tool 5 Press Y to confirm your select...

Page 61: ...E to restart 7 To restore partitions C and D press 4 This option restores partitions C and D from a backup media a Press Y to continue b Press Y to continue c Follow the instructions in the message d...

Page 62: ...Software e When a confirmation message appears notifying you that the restore process was successfully completed remove the DVD from the DVD RW drive and press any key to continue The computer restart...

Page 63: ...4 Diagnostics and Troubleshooting Platform Diagnostics and Configuring the Server 48 General Diagnostic Tools 58 Color Controller C 80 Hardware Diagnostics Software 60 Troubleshooting 67...

Page 64: ...hange assignments for devices and I O ports Set the date and time Set the startup characteristics of the server and the order of startup devices Set and change settings for advanced hardware features...

Page 65: ...t the problem persists try a different cable Check the LAN activity light on the rear of the Color Controller C 80 The LAN activity light illuminates when the Ethernet controller sends or receives dat...

Page 66: ...uring the BIOS Starting the Phoenix cME FirstBIOS Pro Setup Utility 1 Quit the color server software 2 Restart the Color Controller C 80 and immediately press DELETE The Phoenix cME FirstBIOS Pro Setu...

Page 67: ...24 hour format hour minute second System Date Sets the system date The system date is in the format month day year Hard Disk Pre Delay Adds a delay before the HDD is accessed by the BIOS for the firs...

Page 68: ...ure is for debugging only C1 Enhanced Mode If enabled this feature lowers the CPU voltage and frequency to prevent overheating Intel Virtualization Technology If enabled this feature utilizes enhanced...

Page 69: ...nu Exit Saving Changes This option allows you to save any changes that you made and to exit the BIOS setup utility Setup Utility Exit Discarding Changes This option allows you to exit the BIOS setup u...

Page 70: ...ge the System Date and verify that the rest of the settings are the same as the settings in the following window a Press ENTER to save any changes 3 Using the arrow keys select the Advanced menu 4 Usi...

Page 71: ...return to the Advanced menu 7 Using the arrow keys select Advanced Processor Options and press ENTER 8 Verify that the settings are the same as the settings in the following window 9 Press ESC to ret...

Page 72: ...he following window 12 Press ESC to return to the Advanced menu 13 Using the arrow keys select Hardware Monitor and press ENTER 14 Verify that the settings are the same as the settings shown in the wi...

Page 73: ...pears in the Excluded from boot order list do the following a Using the arrow keys select the device that you want to appear in the Boot priority order list b On your keyboard press the X key to add t...

Page 74: ...r that enables the operating system to address the controller is automatically installed from DVD 1 Fast Install SLP 4 2 General Diagnostic Tools The following tools are available to help you identify...

Page 75: ...eeds a certain threshold This works to protect the CPU from being damaged by overheating Hardware BIOS Virus Protection The system BIOS is protected by hardware so that no virus can infect the BIOS ar...

Page 76: ...000 XP and enables local diagnostic testing of Color Controller C 80 products with user level support Code Beep POST Routine Description Recovery Action 16h 1 2 2 3 BIOS ROM checksum Try saving the BI...

Page 77: ...st of all units by selecting the DFE option Results appear as PASS FAIL 4 3 1 Activating the Diagnostics Software Quitting the Color Controller C 80 Software 1 In the Color Controller C 80 workspace c...

Page 78: ...ew Control Level and Help The next section under the Main Menu bar contains shortcut buttons for performing the main JOIND operations The third section is a monitoring area in which the progress of th...

Page 79: ...be run Import Log File Imports the JOIND current log file in which the Pass Fail data is stored from the control station or process print station to the client Exit To exit the application Test Log Fi...

Page 80: ...d by any test whichever comes first When Loop On is selected the test session repeats until the loop termination condition is reached or once a failure is detected whichever comes first User The defau...

Page 81: ...ffer for all tests run or a Quick Batch The contents of this buffer are recorded in an HTML file which appears through the HTML browser Enables quick access to the Error Buffer of a selected test The...

Page 82: ...Activating the Diagnostics Software on page 61 2 Select the components for testing from the diagnostics tree or select DFE to test the entire tree or select Load Quick Batch from the File Menu See Fil...

Page 83: ...cable faults Temperature and general power checkouts Handling error messages Collecting data log files Formatting image disks Disk striping Symptom Recovery Action FusionRA board fails the test 1 Veri...

Page 84: ...short circuits between the system board and the chassis The memory DIMMs are correctly seated Then 1 Turn the power on and off to test the system 2 The battery on your system board may be old Verify t...

Page 85: ...row keys to select the Boot menu 4 Verify the boot order is the same as shown in step 16 on page 57 5 Reload the operating system see page 39 6 Replace the system disk Symptom Recovery Action The Fusi...

Page 86: ...ly set 6 If the memory tests fail replace the failing DIMM Symptom Recovery Action The Color Controller C 80 monitor is blank Verify that 1 The power cord is plugged into the Color Controller C 80 and...

Page 87: ...No Operating System on page 69 The DVD RW drive is not identified 1 Restart the server and press DEL to enter the BIOS setup utility Setup Utility See Using the Phoenix cME FirstBIOS Pro Setup Utilit...

Page 88: ...troller C 80 port 3 Start the server 4 Wait until the Color Controller C 80 splash screen disappears 5 Start your printer If printing fails refer to the next symptom Before you print the printer anima...

Page 89: ...on from the minimal configuration replace FRUs of minimal configuration one at a time until the problem is isolated 4 4 9 Temperature Checkout Accurate cooling of the system is important for proper o...

Page 90: ...is replaced within 48 hours 4 4 10 Error Messages There are four types of error messages System Hardware Software Connection Each error message indicates a problem and sometimes also a recovery action...

Page 91: ...ted correctly and restart the system 2 Run the diagnostics test 3 If the error message still appears replace the board Message Recovery Action Failed to spool the file during job submission Check the...

Page 92: ...oceed to step 3 2 If you want to save the cab file to another location click Browse select the new location click Save and then OK 3 Restart the Color Controller C 80 software 4 Recreate the problem y...

Page 93: ...recognizes foreign disks See Striping Foreign Disks on page 78 An image disk either has been replaced with a new disk and the operating system identifies it as an unknown disk See Striping Unknown Dis...

Page 94: ...ng Disk on page 82 3 After completing disk striping the following message appears 4 Click OK Striping Foreign Disks Perform the following procedure to remind the operating system that a striped volume...

Page 95: ...p 3 of 3 disks selected check box is selected and click OK 4 Click OK The Dynamic disks are striped as shown in the following window Note Foreign disks are any hard disks that were recognized as dynam...

Page 96: ...following procedures describe how to initialize unknown disks to basic disks and to convert basic disks to dynamic disks Perform the following procedures if you have replaced an image disk To initial...

Page 97: ...nverting the Disks to Dynamic Disks 1 In the Computer Management window right click in the disk area that you want to convert and select Convert to Dynamic Disk 2 Select the disks to convert to dynami...

Page 98: ...milar to the following window 4 Proceed to Creating a Striped Volume Removing a Missing Disk Perform the following procedure when you have replaced a faulty disk and the new disk is intermittenly unav...

Page 99: ...Volume Creating a Striped Volume After you have replaced a disk or low level formatted one or more disks you need to create a striped volume 1 In the Computer Management window right click the white...

Page 100: ...4 Diagnostics and Troubleshooting 4 In the Available list select each disk that you want to include in the new volume and click Add 5 Click Next 6 Select Do not assign a drive letter or drive path and...

Page 101: ...lect Do not format this volume and click Next 8 Click Finish 9 Confirm that the disks are striped Confirming the Disk Striping After you complete the New Volume Wizard the Computer Management window a...

Page 102: ...when suggested as a recovery action 1 Close all software programs and wait for them to shut down completely 2 From the Windows Start menu select Color Controller C 80 Color Controller C 80 Tools Form...

Page 103: ...87 5 Click Yes 6 Click OK 7 To enable the changes to take effect restart your computer...

Page 104: ...88 Chapter 4 Diagnostics and Troubleshooting...

Page 105: ...Parts List 91 Before You Begin 93 Removing and Placing the Side Cover and Front Panel 94 Working with Boards Adapters 98 Working With the System Board 103 Replacing the DVD RW Drive 118 Replacing a Ha...

Page 106: ...the following diagram to locate a specific part for replacement In the Spare Parts List on page 91 each number in the Item number column corresponds to a spare part not all the parts in the spare par...

Page 107: ...h DFE Net Cable Protector 252 21226A Creo 1 10 FusionRA LF Board 503 00561B Creo 1 11 Universal Stand Type II 518 01588A Creo 1 12 CPU Kit Q9400 Quad Core2 2 66GHZ 1333MHZ 518 03787A 1 13 Kit Color Co...

Page 108: ...3 2 26 SATA Cable Straight Right Angle UP 609 00564 5 27 P S ATX 350W 6 SATA Connectors 609 00568 Third party 1 28 Color Controller C 80 Media Software Kit V1 0 634 00634A Creo 1 Color Controller C 80...

Page 109: ...blade screwdriver available 5 3 1 System Reliability Considerations To help ensure proper cooling and system reliability verify that The side cover is in place during normal operations There is space...

Page 110: ...Front Panel This section describes the procedures used to remove and place the Color Controller C 80 cover and front panel 5 4 1 Removing the Side Cover 1 Turn off the Color Controller C 80 and all pe...

Page 111: ...s in the side cover with the matching tabs in the chassis Insert the side cover into the slots 5 Slide the side cover toward the front of the server 6 Tighten the two screws that secure the side cover...

Page 112: ...e front of the chassis and move the edge of the front panel slightly away from the chassis See step 4 in Figure 10 and Figure 11 on page 97 5 Using a flat screwdriver gently pry the four concealed tab...

Page 113: ...roller C 80 on its side insert the concealed tabs along the bottom edge of the front panel into the matching slots in the chassis 2 Push the top of the front panel toward the server until the two prot...

Page 114: ...nnectivity 5 5 1 Visual Inspection Whenever you replace any component in the unit 1 Check that all boards are retained properly in their slots 2 Check that the cables are routed properly 3 Check the e...

Page 115: ...emoving and Placing the Side Cover and Front Panel on page 94 4 Using a cross head screwdriver remove the hexagonal screws that hold the board at the right and the left of the chassis 5 Grip the front...

Page 116: ...e expansion slot and is locked in position 3 If you have other options to remove or replace do so now 4 Insert the hexagonal screw that holds the board at the rear of the chassis and tighten it 5 Inse...

Page 117: ...6 on page 102 Removing a DIMM 1 Press down on the two DIMM release tabs so that they rotate outward releasing the memory from its seat 2 Gently pull the DIMM up and out of the server Note Removing or...

Page 118: ...one at a time on the edges of the DIMM Ensure that you press the DIMM vertically into the tab See Figure 16 Figure 16 Installing a DIMM 5 Verify that the release tabs are in the closed position If a g...

Page 119: ...removing and installing the system board 5 6 1 System Board Internal Cable Connectors The following illustration identifies system board connectors for internal cables Figure 17 System board internal...

Page 120: ...eplacing the Central Processing Unit CPU on page 109 7 Remove the eight system board screws 8 Release the system board from the RFI clips by sliding the system board away from the rear of the server 9...

Page 121: ...y unpainted metal surface on the server then remove the system board from the package and place it on the worktable 4 Turn over the system board 5 Attach the metal bracket to the system board Attentio...

Page 122: ...he bracket so that it is face down and align it with the diagram on the system board Figure 20 Diagram of metal bracket b When the bracket is properly aligned the four ends should fit into place over...

Page 123: ...sis 11 Insert the eight screws into the holes Do not tighten the screws until all the screws are inserted 12 Return the rear fan See Installing the Rear Fan on page 124 13 Return the memory modules Se...

Page 124: ...te To assist you in reconnecting the cables to the system board see the following table and Figure 17 on page 103 Cable System Board Connector Power supply JPW1 JPW2 USB USB 3 4 J46 USB 2 3 J44 Serial...

Page 125: ...t all external cables and power cords 3 Remove the side cover See Removing the Side Cover on page 94 4 Remove the FusionRA board See Removing the FusionRA Board on page 99 5 Remove the rear fan See Re...

Page 126: ...ink assembly up and out of the server Removing the Microprocessor 1 Unlock the microprocessor socket a Using your thumb press the socket lever to release the metal frame from its locking position CPU...

Page 127: ...tal plate 2 Using your thumb and index finger carefully grasp the microprocessor by its north and south center edges and lift it up and out of the server Figure 28 Removing the microprocessor 3 Store...

Page 128: ...Unlock the microprocessor socket a Press the socket lever down to release the load plate from its locking position The load plate covers the microprocessor socket Figure 29 Microprocessor socket leve...

Page 129: ...ket a Make sure that Pin 1 of the microprocessor socket is located at the left bottom of the microprocessor housing 4 Insert the microprocessor into the microprocessor socket Figure 32 Aligning the mi...

Page 130: ...four corners of the microprocessor to make sure that it is properly installed Figure 33 Checking that the microprocessor is properly installed 5 Using your thumb gently push the socket lever down and...

Page 131: ...s in the CPU fan and heat sink assembly with their corresponding holes on the system board Insert the four spring screws and tighten Thermal grease Important Make sure to insert and secure the spring...

Page 132: ...mber CR2032 To avoid possible danger read and comply with the following safety statement The battery is located on the system board below slot 5 See Figure 13 on page 99 Removing the Battery 1 Follow...

Page 133: ...he battery Installing the Battery 1 Tilt the battery so that you can insert it into the socket on the side opposite the battery clip 2 Press the battery down into the socket until it clicks into place...

Page 134: ...ect all power cords and external cables 3 Remove the side cover See Removing and Placing the Side Cover and Front Panel on page 94 4 Disconnect the cables connected to the DVD RW 5 Press the retaining...

Page 135: ...ack up the system configuration Preferences window See Color Controller C 80 Powered by Creo Color Server Technology for Pro C900 User Guide 731 01699A EN 2 Replace the disk page 119 3 Reinstall DVD 1...

Page 136: ...ver Figure 41 Removing a hard disk drive 6 Identify which hard disk you want to remove 7 Loosen the two screws on either side of the disk drive and pull the disk drive out of the chassis 5 8 2 Install...

Page 137: ...ds and turn on the server 5 9 Replacing the Power Supply Perform the following procedures to replace the power supply 5 9 1 Removing the Power Supply 1 Review Safety Information Multi Language on page...

Page 138: ...erver 2 Insert the power supply into the opening at the rear of the chassis 3 Align the holes in the power supply with the holes in the chassis 4 Insert the four power supply screws and tighten them 5...

Page 139: ...ff the Color Controller C 80 and peripheral devices Disconnect all AC power cords and external cables 3 Remove the side cover See Removing the Side Cover on page 94 4 Disconnect the fan cable from the...

Page 140: ...g the other four tabs with their respective slots 4 Press the rear fan bracket against the rear of the server until all the tabs are in their slots and then move the rear fan bracket downward until it...

Page 141: ...ce the fan bracket on the new PCI fan 2 Place the PCI fan in position in the front of the server 3 Guide the two locking tabs through the top of the slots 4 Press the fan bracket against the rear of t...

Page 142: ...126 Chapter 5 Hardware and Maintenance Repairs...

Page 143: ...A Specifications and Standards Environmental Requirements 128 Installation Steps 128 Specifications 128 Operating Environment 129 Standards 130 Reliability and Maintenance 131...

Page 144: ...time approximately 15 minutes A 3 Specifications A 3 1 Dimensions and Weight Color Controller C 80 D x W x H cm D x W x H in Weight Unpacked 58 8 20 44 23 1 7 9 17 3 16 8 kg 37 lb Packed 63 78 5 46 2...

Page 145: ...without wheels Keyboard D x W x H cm D x W x H in Weight Unpacked 44 17 3 17 7 2 1 kg 2 2 lb Packed 55 21 4 21 8 2 1 kg 2 2 lb Stand Contents and Carton Optional D x W x H cm D x W x H in Weight Unpa...

Page 146: ...sity of 1m2 s3 in frequency range of 10 200 Hz and acceleration spectral density of 0 3 m2 sec3 in frequency range of 200 2000 Hz Free fall Shipping 0 25 m Static load Shipping 10 Kpa Stacking Shippin...

Page 147: ...ia and New Zealand CISPR 22 2006 class B Europe EMC Directive 89 336 EEC European EMC standards Radiated Emissions EN55022 2006 A1 2007 Class B Harmonics EN61000 3 2 2006 Flicker EN61000 3 3 1995 A1 2...

Page 148: ...B X7SBL LN2 154 641 CMPTR MEM MODULE 1GB DDR2 ECC 800MHZ 4 887 586 UP Q9400 QUAD CORE2 2 66GHZ 6M 1333MHZ 90 909 CMPTR REAR FAN 120X120X25 98CFM 12VDC 27 998 FAN AXIAL 12V DC 92 92 25 42 CFM TACH 34 9...

Page 149: ......

Page 150: ......

Reviews: