Maintenance, Overhaul, and Software Upgrade
2-12
Service Manual
a.
Turn on the ventilator, and wait for the CMOS error.
b.
Connect a USB keyboard, and then press F1.
c.
After the ventilator completes the power on, enter the correct date and time using the
Technical
Setup
screen.
6.
Verify the time and date:
a.
Turn the ventilator off, allowing it to fully shut down.
b.
After 30 seconds has elapsed, turn the ventilator back on.
c.
Confirm the time and date shown on the screen are correct.
Figure 2-9.
Verifying the Time and Date
Note:
If the ventilator is fitted with a SBC2105A board, verify the ventilator maintains the correct date and time
following a ventilator power down as part of the maintenance procedure. If the correct date and time are
not maintained, then replace the coin battery on the SBC2105A board as described in section
.”
Summary of Contents for Newport e360
Page 1: ...Service Manual Newport e360 Ventilator with Accessories TM...
Page 7: ...v C Diagrams Index...
Page 8: ...Page Left Intentionally Blank vi...
Page 12: ...Page Left Intentionally Blank viii...
Page 24: ...Introduction Page Left Intentionally Blank 1 12 Service Manual...
Page 56: ...Maintenance Overhaul and Software Upgrade Page Left Intentionally Blank 2 32 Service Manual...
Page 112: ...Calibration Procedures Page Left Intentionally Blank 5 16 Service Manual...
Page 146: ...Ordering and Contact Information Page Left Intentionally Blank B 6 Service Manual...
Page 148: ...Diagrams C 2 Service Manual Figure C 1 Newport e360 Ventilator Electrical Block Diagram...
Page 149: ...Service Manual C 3 Figure C 2 Newport e360 Ventilator Pneumatic Diagram SPD2100A...
Page 150: ...Diagrams Page Left Intentionally Blank C 4 Service Manual...
Page 152: ...Page Left Intentionally Blank 1 2...
Page 153: ......