
Chapter 13
13-28
13.3.5 Scheduled Service Items
0006-9902
iR105i/iR105+ / iR9070
Do not use solvents or oils not indicated herein.
T-13-24
13
Press the leakage breaker test
switch to make sure that the
breaker operates normally.
Thereafter,
turn off the power switch,
and shift the lever to ON position;
then, turn on the power switch.
Press the test switch while
the power switch is ON and
the lever [1] of the leakage
breaker is at ON; if normal,
the lever should shift to OFF
position to cut off the power
(Pay attention to the
orientation
whenever replacing the
breaker. If you have replaced
the breaker, be sure to check
its operation).
Check to make sure that the grounding is correct; otherwise, leakage may not trigger the
leakage breaker.
14
Put the test prints in order, and
clean up the area around the
machine.
15
Record the latest counter readings.
16
Record the latest counter readings. Record the results of the
check made on the leakage
breaker in the Service Book.
Service interval
Unit
Location
installation
every every Remarks
500,000
1,000,000
Externals and
controls
Copyboard glass
Clean
Ozone filter (FM2,
FM8, M20)
Clean
Replace
Remove dust from the
filter surface.
Dust filter (FM1 (2
pc.), FM3, FM10, front
cover, upper front
cover)
Clean
Remove dust from the
filter surface.
Scanner system Scanner wire
Check
Adjust
Check only at initial
500,000 pages.
Scanner rail
Clean
Lubricate
Use silicone oil
S-20 (FY9-6011)
Optical system No. 1 to No. 3 mirrors
Clean
Dust-proof glass
Clean
Reflecting plate
Clean
Standard white plate
Clean
Pre-transfer exposure
LED
Clean
Replace
Charging
assembly
Charging wire
(Primary)
Clean
Replace
If high temperature/
humidity, every
250,000 pages.
Charging wire
(Transfer/separation)
Clean
Replace
If high temperature/
humidity, every
250,000 pages.
Charging wire (Pre-
transfer)
Clean
Replace
If high temperature/
humidity, every
250,000 pages.
[1]
Summary of Contents for ImageRunner iR8500 Series
Page 1: ...Apr 5 2005 Service Manual iR8500 Series ...
Page 2: ......
Page 6: ......
Page 32: ...Contents ...
Page 33: ...Chapter 1 Introduction ...
Page 34: ......
Page 98: ......
Page 99: ...Chapter 2 Installation ...
Page 100: ......
Page 180: ...Chapter 2 2 78 F 2 272 2 1 1 3 ...
Page 181: ...Chapter 3 Basic Operation ...
Page 182: ......
Page 184: ......
Page 207: ...Chapter 4 Main Controller ...
Page 208: ......
Page 245: ...Chapter 4 4 35 F 4 72 1 2 ...
Page 246: ......
Page 247: ...Chapter 5 Original Exposure System ...
Page 248: ......
Page 252: ......
Page 306: ......
Page 307: ...Chapter 6 Image Processing System ...
Page 308: ......
Page 310: ......
Page 319: ...Chapter 7 Laser Exposure ...
Page 320: ......
Page 322: ......
Page 335: ...Chapter 8 Image Formation ...
Page 336: ......
Page 340: ......
Page 399: ...Chapter 9 Pickup Feeding System ...
Page 400: ......
Page 404: ......
Page 482: ......
Page 483: ...Chapter 10 Fixing System ...
Page 484: ......
Page 524: ......
Page 525: ...Chapter 11 External and Controls ...
Page 526: ......
Page 530: ......
Page 583: ...Chapter 12 MEAP ...
Page 584: ......
Page 586: ......
Page 589: ...Chapter 13 Maintenance and Inspection ...
Page 590: ......
Page 592: ......
Page 610: ...Chapter 13 13 18 F 13 17 1 2 3 ...
Page 648: ......
Page 649: ...Chapter 14 Standards and Adjustments ...
Page 650: ......
Page 654: ......
Page 723: ...Chapter 15 Correcting Faulty Images ...
Page 724: ......
Page 728: ......
Page 792: ......
Page 793: ...Chapter 16 Self Diagnosis ...
Page 794: ......
Page 796: ......
Page 841: ...Chapter 17 Service Mode ...
Page 842: ......
Page 1076: ......
Page 1077: ...Chapter 18 Upgrading ...
Page 1078: ......
Page 1080: ......
Page 1108: ...Chapter 18 18 28 F 18 45 3 Click Start F 18 46 4 Click Save F 18 47 5 Click OK ...
Page 1111: ...Chapter 19 Service Tools ...
Page 1112: ......
Page 1114: ......
Page 1120: ......
Page 1121: ...Apr 5 2005 ...
Page 1122: ......