Upgrading Your Server 9-19
POWER SUPPLY UNIT
Your server contains one or two power supply units.
The second power supply unit is optional and provides a redundant configuration that ensures continued operation of the
system in the unlikely event one of the power supply unit fails.
Power supply
slot (standard)
Power supply
slot (option)
Installation
Take the following steps to install a power supply unit:
1.
See the section "Preparing for Installation and Removal" described earlier.
IMPORTANT:
Be sure to turn off the power. Failure to do so causes the server to malfunction or
fail.
2.
Remove the blank cover.
IMPORTANT:
Keep the removed blank cover for future use.
Summary of Contents for NovaScale R440 E2
Page 1: ...NovaScale R440 E2 User s Guide NOVASCALE REFERENCE 86 A1 46FB 00...
Page 2: ......
Page 32: ...1 16 Notes on Using Your Server...
Page 70: ...2 38 General Description...
Page 94: ...3 24 Setting Up Your Server This page is intentionally left blank...
Page 147: ...Configuring Your Server 4 53 Property of Physical Device in the Universal RAID Utility...
Page 272: ...5 74 Installing the Operating System with Express Setup This page is intentionally left blank...
Page 308: ...7 12 Maintenance This page is intentionally left blank...
Page 408: ...9 54 Upgrading Your Server Screws...
Page 446: ...9 92 Upgrading Your Server This page is intentionally left blank...
Page 456: ......
Page 458: ...C 2 IRQ This page is intentionally left blank...
Page 490: ...D 32 Installing Windows Server 2008 4 Activate Windows The Windows activation is complete...
Page 494: ......
Page 544: ...G 2 Using a Client Computer with a CD Drive This page is intentionally left blank...
Page 548: ...H 4 Product Configuration Record Table This page is intentionally left blank...
Page 551: ......
Page 552: ...BULL CEDOC 357 AVENUE PATTON B P 20845 49008 ANGERS CEDEX 01 FRANCE REFERENCE 86 A1 46FB 00...