
4
Click Open.
To open worksets from the Worksets dialog:
1
Open your local copy of the central file.
2
Click Collaborate tab
➤
Worksets panel
➤
Worksets.
3
In the Worksets dialog, select the desired workset, and click Open, or, under Opened, click Yes.
4
Click OK.
Making Worksets Editable
There are various methods you can use to make worksets editable.
To make worksets editable from the Worksets dialog:
1
Open your local copy of the central file.
2
Click Collaborate tab
➤
Worksets panel
➤
Worksets.
3
In the Worksets dialog, to filter the display of worksets, make the appropriate selections under
Show. For example, to see the Project Standards worksets, select Project Standards.
4
Click under Editable for the workset, and select Yes. Alternatively, you can select the workset
name, and click Editable.
NOTE
If a workset is owned by another user, you cannot change its editable status.
5
Repeat the previous step for as many worksets as you want to edit.
TIP
To check out multiple worksets at once, click the workset name under the Name column to select
it, hold Ctrl or Shift and select other worksets, and then click Editable. You can select all worksets by
pressing Ctrl+A.
6
Click OK.
When you click OK, ownership information is communicated to the central file and to all local
copies of the central file, so that all team members have the current ownership information.
To make worksets editable by selecting an element
In the drawing area, right-click an element, and click Make Worksets Editable.
To make project view worksets editable from the Project Browser
In the Project Browser, right-click a project view, and click Make Workset Editable.
To make a sheet view workset editable
In the Project Browser, right-click a sheet view, and click Make Workset Editable With All Views. The sheet
view workset and all the project view worksets that are on the sheet are now editable.
Use the Make Workset Editable option if you only want to make the sheet editable. If you already own the
workset, this option is not available.
Editing a Workset
1
Click Collaborate tab
➤
Worksets panel, and select the workset from the Active Workset
drop-down.
2
If you want all elements that are not in the active workset to be gray, click Gray Inactive Worksets.
Editing Workshared Projects | 1263
Summary of Contents for 256B1-05A761-1301 - AutoCAD Revit Structure Suite 2010
Page 1: ...Revit Architecture 2010 User s Guide March 2009 ...
Page 4: ......
Page 42: ...xlii ...
Page 84: ...42 ...
Page 126: ...84 ...
Page 166: ...124 ...
Page 229: ...Schedule Field Formatting Calculating Totals Specifying Schedule Properties 187 ...
Page 230: ...Schedule with Grid Lines Schedule with Grid Lines and an Outline 188 Chapter 5 Project Views ...
Page 304: ...262 ...
Page 427: ...Defining the first scale vector Defining the second scale vector Resizing Graphically 385 ...
Page 454: ...Before painting applying material to stairs 412 Chapter 8 Editing Elements ...
Page 456: ...414 ...
Page 486: ...444 ...
Page 674: ...632 ...
Page 809: ...Curtain wall Curtain Grid Curtain Walls Curtain Grids and Mullions 767 ...
Page 994: ...952 ...
Page 1016: ...974 ...
Page 1204: ...1162 ...
Page 1290: ...1248 ...
Page 1318: ...1276 ...
Page 1372: ...1330 ...
Page 1382: ...1340 ...
Page 1462: ...1420 ...
Page 1492: ...1450 ...