
floor plan is divided into dependent views, to show each part of the building on separate sheets. (See
on page 192.) However, on the dependent view for the aviary wing, you do not want to
show the grid lines for the main building. On the dependent view for the main building, you do not want
to show the grid lines for the aviary wing. You can accomplish this using scope boxes.
To use scope boxes to control datum elements
1
Create one or more scope boxes.
2
Apply a scope box to datum elements (grid lines, levels, or reference planes).
3
(Optional) Apply a scope box to desired views.
Creating a Scope Box
in plan views only. After a scope box is created, you can change its size and position
in a 3D view.
1
In a plan view, click View tab
➤
Create panel
➤
Scope Box.
2
On the Options Bar, enter a name and specify a height for the scope box, if desired.
TIP
You can also change the name of the scope box after creating it. Select the scope box, click
Modify Scope Boxes tab
➤
Element panel
➤
Element Properties. In the Instance Properties dialog,
enter a value for the Name property.
3
To draw a scope box, click in the upper left-hand corner to start the box. Click in the lower
right-hand corner to finish it.
The following floor plan shows 2 scope boxes: one around the main building, and another
around the aviary wing. When you draw a scope box, it displays drag controls, which you can
use to resize the scope box. You can also rotate the scope box using the rotate control
and
the Rotate tool
. (See
on page 379.)
Controlling Visibility of Datums Using Scope Boxes | 1113
Summary of Contents for 256B1-05A761-1301 - AutoCAD Revit Structure Suite 2010
Page 1: ...Revit Architecture 2010 User s Guide March 2009 ...
Page 4: ......
Page 42: ...xlii ...
Page 84: ...42 ...
Page 126: ...84 ...
Page 166: ...124 ...
Page 229: ...Schedule Field Formatting Calculating Totals Specifying Schedule Properties 187 ...
Page 230: ...Schedule with Grid Lines Schedule with Grid Lines and an Outline 188 Chapter 5 Project Views ...
Page 304: ...262 ...
Page 427: ...Defining the first scale vector Defining the second scale vector Resizing Graphically 385 ...
Page 454: ...Before painting applying material to stairs 412 Chapter 8 Editing Elements ...
Page 456: ...414 ...
Page 486: ...444 ...
Page 674: ...632 ...
Page 809: ...Curtain wall Curtain Grid Curtain Walls Curtain Grids and Mullions 767 ...
Page 994: ...952 ...
Page 1016: ...974 ...
Page 1204: ...1162 ...
Page 1290: ...1248 ...
Page 1318: ...1276 ...
Page 1372: ...1330 ...
Page 1382: ...1340 ...
Page 1462: ...1420 ...
Page 1492: ...1450 ...