5
(Optional) Define a fixed height for the revision schedule.
Defining a fixed height ensures that the revision schedule does not expand beyond the boundaries
of a sheet. See
Defining the Height of the Revision Schedule
on page 1052.
6
To save the title block, on the Quick Access toolbar, click
(Save).
7
Load the title block into a project.
See
Loading a Title Block into a Project
on page 1048.
Defining the Height of the Revision Schedule
By default, revision schedules use a variable height, so that the schedules can expand to accommodate all
of the revisions for a sheet.
If needed, you can specify that a revision schedule has a fixed (user defined) height. On a sheet in a project,
the schedule displays only the revisions that can fit in the allotted space. If the sheet refers to more revisions
than can fit in the schedule, Revit Architecture shows the most recent revisions and omits the rest.
To specify a fixed height, modify the revision schedule in the title block family, and use the Height option
of the Revision Properties dialog, as follows.
To define a fixed height for a revision schedule
1
Open the title block for editing.
See
on page 1047.
2
Modify the revision schedule properties, as follows:
a
In the Project Browser, under Views (all)
➤
Schedules, right-click Revision Schedule, and
click Properties.
b
On the Instance Properties dialog, for Appearance, click Edit.
c
On the Appearance tab of the Revision Properties dialog, for Height, select User defined.
d
Click OK twice.
3
In the drawing area, select the revision schedule of the title block.
The status bar displays Schedule Graphics : Schedule Graphics : Revision Schedule.
The bottom of the revision schedule displays a blue dot. Grid lines display to indicate the amount
of space required for each row of revision information (assuming one line per revision row; in
a sheet, long values wrap to the next line). In this mode, these grid lines display regardless of
whether the revision schedule is set to display grid lines.
4
Drag the blue dot up or down until the revision schedule is the desired height.
The blue dot indicates the bottom boundary of the revision schedule. If a sheet in a project has
more revisions than can fit in this space, Revit Architecture omits the oldest revisions from the
schedule.
1052 | Chapter 17 Preparing Construction Documents
Summary of Contents for 256B1-05A761-1301 - AutoCAD Revit Structure Suite 2010
Page 1: ...Revit Architecture 2010 User s Guide March 2009 ...
Page 4: ......
Page 42: ...xlii ...
Page 84: ...42 ...
Page 126: ...84 ...
Page 166: ...124 ...
Page 229: ...Schedule Field Formatting Calculating Totals Specifying Schedule Properties 187 ...
Page 230: ...Schedule with Grid Lines Schedule with Grid Lines and an Outline 188 Chapter 5 Project Views ...
Page 304: ...262 ...
Page 427: ...Defining the first scale vector Defining the second scale vector Resizing Graphically 385 ...
Page 454: ...Before painting applying material to stairs 412 Chapter 8 Editing Elements ...
Page 456: ...414 ...
Page 486: ...444 ...
Page 674: ...632 ...
Page 809: ...Curtain wall Curtain Grid Curtain Walls Curtain Grids and Mullions 767 ...
Page 994: ...952 ...
Page 1016: ...974 ...
Page 1204: ...1162 ...
Page 1290: ...1248 ...
Page 1318: ...1276 ...
Page 1372: ...1330 ...
Page 1382: ...1340 ...
Page 1462: ...1420 ...
Page 1492: ...1450 ...