Z 1 =R 1 + jX 1
Z 0 =R 0 + jX0
A
B
Zone 1
Zone 2
C
Zone 1
Zone 2
Communication
Y
Y
REL 650
REL650
ANSI11000250-1-en.vsd
Delta based fault
inception detection and
forward fault inhibit
Delta based fault
inception detection and
forward fault inhibit
ANSI11000250 V1 EN
Figure 18:
Principle of delta blocking communication scheme
When a communication signal is received (CR) the overeaching zone (zone2) is blocked.
The logic is shown in figure
Receive signal (CR)
Trip
Send signal (CS)
Zone 1 TRIP
Zone 1 PICKUP
Zone 2 TRIP
Zone 2 PICKUP
ZQMPDIS (21)
OR
AND
CS
Delta based fault
inception detection
ZCPSCH (85)
ANSI11000251-1-en.vsd
AND
ANSI11000251 V1 EN
Figure 19:
Logic of delta blocking communication scheme
1MRK 506 334-UUS A
Section 3
REL650 setting examples
63
Application manual
Summary of Contents for REL650 series
Page 1: ...Relion 650 series Line distance protection REL650 ANSI Application manual...
Page 2: ......
Page 30: ...24...
Page 99: ...IED IED ANSI05000460 V2 EN 1MRK 506 334 UUS A Section 4 Analog inputs 93 Application manual...
Page 110: ...104...
Page 260: ...254...
Page 274: ...268...
Page 280: ...274...
Page 396: ...390...
Page 494: ...488...
Page 506: ...500...
Page 515: ...509...