![ABB REL650 series Applications Manual Download Page 203](http://html1.mh-extra.com/html/abb/rel650-series/rel650-series_applications-manual_3479164203.webp)
IEC10000273-1-en.vsd
IEC10000273 V1 EN
Figure 94:
Fault time with maintained selectivity
To assure selectivity between different protections, in the radial network, there have to be
a minimum time difference ∆t between the time delays of two protections. The minimum
time difference can be determined for different cases. To determine the shortest possible
time difference, the operation time of protections, breaker opening time and protection
resetting time must be known. These time delays can vary significantly between different
protective equipment. The following time delays can be estimated:
•
Protection operate time:
15-60 ms
•
Protection resetting time:
15-60 ms
•
Breaker opening time:
20-120 ms
7.4.3.3
Example
Assume two substations A and B directly connected to each other via one line, as shown
in the figure
. Consider a fault located at another line from the station B. The fault
current to the overcurrent protection of IED B1 has a magnitude so that the protection will
1MRK 506 334-UUS A
Section 7
Current protection
197
Application manual
Summary of Contents for REL650 series
Page 1: ...Relion 650 series Line distance protection REL650 ANSI Application manual...
Page 2: ......
Page 30: ...24...
Page 99: ...IED IED ANSI05000460 V2 EN 1MRK 506 334 UUS A Section 4 Analog inputs 93 Application manual...
Page 110: ...104...
Page 260: ...254...
Page 274: ...268...
Page 280: ...274...
Page 396: ...390...
Page 494: ...488...
Page 506: ...500...
Page 515: ...509...