
Operator’s Manual for Crawler Crane
Operator’s Manual for Crawler Crane
Assembly
and
Dism
antling
5-81
5.7 Assembly and dismantling of tip boom
A
B
3
1
2
1
Figure 5-71
Assembly of tip boom
The procedures for assembly of tip boom are shown in figure 5-71:
–
Align the upper connecting hole of tip boom with the A hole in main boom head.
–
Insert pin spindle (part 2) and secure it with cotter pin (part 1).
–
Align the lower connecting hole with the B hole in main boom head.
–
Insert pin spindle (part 3) and secure it with cotter pin (part 1).
The procedure for dismantling tip boom is the opposite of assembly.
CAUTION
Slowly raise and lower main boom with tip boom to prevent tip boom against damage
due to the impact brought by jerky operation.
For reference only.
Operators manual should be consulted and adhered to.
Содержание ZCC1100
Страница 2: ...For reference only Operators manual should be consulted and adhered to...
Страница 4: ...For reference only Operators manual should be consulted and adhered to...
Страница 6: ...For reference only Operators manual should be consulted and adhered to...
Страница 12: ...For reference only Operators manual should be consulted and adhered to...
Страница 14: ...For reference only Operators manual should be consulted and adhered to...
Страница 22: ...For reference only Operators manual should be consulted and adhered to...
Страница 80: ...For reference only Operators manual should be consulted and adhered to...
Страница 82: ...For reference only Operators manual should be consulted and adhered to...
Страница 140: ...For reference only Operators manual should be consulted and adhered to...
Страница 206: ...For reference only Operators manual should be consulted and adhered to...