
Operator’s Manual for Crawler Crane
Operator’s Manual for Crawler Crane
Assembly
and
Dism
antling
5-61
1
2
Figure 5-53 Bolt preassembled main boom sections to main boom pivot section
The components used in connecting main boom sections are shown in the table 5-14, and the
serial numbers in the table is the same with those in figure 5-52, and figure 5-53.
Table 5-14 Components used to connect main boom sections
No.
Names of the
components
Illustration
1
Double tapered pin
7.52" (191mm)
4.13" (105mm)
1.
77"
(4
5mm)
2
Retaining pin
DANGER
(1) The connecting pin must always be fitted from outside inwards during assembly.
(2) It is prohibited to put hand or fingers into the connecting hole during assembly.
(3) No person is allowed to stand beneath or in the boom during assembly.
(4) It is prohibited to climb up the boom, stand or walk on the boom.
(5) Use a ladder or other similar tools to carry out assembly operation.
For reference only.
Operators manual should be consulted and adhered to.
Содержание ZCC1100
Страница 2: ...For reference only Operators manual should be consulted and adhered to...
Страница 4: ...For reference only Operators manual should be consulted and adhered to...
Страница 6: ...For reference only Operators manual should be consulted and adhered to...
Страница 12: ...For reference only Operators manual should be consulted and adhered to...
Страница 14: ...For reference only Operators manual should be consulted and adhered to...
Страница 22: ...For reference only Operators manual should be consulted and adhered to...
Страница 80: ...For reference only Operators manual should be consulted and adhered to...
Страница 82: ...For reference only Operators manual should be consulted and adhered to...
Страница 140: ...For reference only Operators manual should be consulted and adhered to...
Страница 206: ...For reference only Operators manual should be consulted and adhered to...