Figure 5-67 Assembly of fixed jib
CAUTION
(1) Check whether the spring is mounted in the outer pipe of front tilting-back support
of fixed jib. If the spring is not mounted, the tilting-back support can not prevent it
against falling, then the fixed jib may topple over.
(2) Make sure that the hoisting rope near the boom head is not exposed to crushing
force during rope reeving and boom raising process.
(3) Ensure that the nylon guide on fixed jib head is always rolling on the ground before
fixed jib is lifted away from the ground.
(4) Take great care to connect rear titling-back support of fixed jib to main boom head.
(5) Install the pin spindle correctly on front tilting-back support according to the
procedure (f), otherwise, the fixed jib will be damaged.
Inner pipe
Outer pipe
Pin spindle
End of inner pipe
For reference only.
Operators manual should be consulted and adhered to.
Содержание ZCC1100
Страница 2: ...For reference only Operators manual should be consulted and adhered to...
Страница 4: ...For reference only Operators manual should be consulted and adhered to...
Страница 6: ...For reference only Operators manual should be consulted and adhered to...
Страница 12: ...For reference only Operators manual should be consulted and adhered to...
Страница 14: ...For reference only Operators manual should be consulted and adhered to...
Страница 22: ...For reference only Operators manual should be consulted and adhered to...
Страница 80: ...For reference only Operators manual should be consulted and adhered to...
Страница 82: ...For reference only Operators manual should be consulted and adhered to...
Страница 140: ...For reference only Operators manual should be consulted and adhered to...
Страница 206: ...For reference only Operators manual should be consulted and adhered to...