
Operator’s Manual for Crawler Crane
Operator’s Manual for Crawler Crane
Assembly
and
Dism
antling
5-63
b) Move right control lever to the left to spool up derricking winch until the main boom head is
raised by the derricking rope to a proper position a littler higher than the load hook,
referring to figure 5-56.
Figure 5-56 Rope reeving
c)
Place the load hook directly under main boom head, and then reeve the hoisting rope
between hook block and rope pulley on main boom head in accordance with the rope
reeving plan (for the details, please refer to section 4.6 “rope reeving” in Chapter 4), finally
secure the rope end point with rope lock and rope thimble, referring to the figure 5-57.
Figure 5-57 Reeving in load hook
CAUTION
The working personnel who guide the wire rope should take great care to prevent
against falling down when walking on the boom frame; otherwise, serious accident may
occur.
For reference only.
Operators manual should be consulted and adhered to.
Содержание ZCC1100
Страница 2: ...For reference only Operators manual should be consulted and adhered to...
Страница 4: ...For reference only Operators manual should be consulted and adhered to...
Страница 6: ...For reference only Operators manual should be consulted and adhered to...
Страница 12: ...For reference only Operators manual should be consulted and adhered to...
Страница 14: ...For reference only Operators manual should be consulted and adhered to...
Страница 22: ...For reference only Operators manual should be consulted and adhered to...
Страница 80: ...For reference only Operators manual should be consulted and adhered to...
Страница 82: ...For reference only Operators manual should be consulted and adhered to...
Страница 140: ...For reference only Operators manual should be consulted and adhered to...
Страница 206: ...For reference only Operators manual should be consulted and adhered to...