
Operator’s Manual for Crawler Crane
Operator’s Manual for Crawler Crane
Assembly
and
Dism
antling
5-41
G14
G11
G13
G15
G11
G11
G14
G15
G13
G15
G15
G15
G15
G15
G15A
G15
G12
G15A
G15
G15
G15
G15A
G15
G12
G12
Figure 5-41 Assembly of main boom
DANGER
(1) The combination of 219'10" (67m) main boom in above figure is preferable
combination.
(2) No person is allowed to stand inside the boom or beneath it during the assembly of
main boom.
200'2" (61m) 210' (64m) 219'10" (67m)
For reference only.
Operators manual should be consulted and adhered to.
Содержание ZCC1100
Страница 2: ...For reference only Operators manual should be consulted and adhered to...
Страница 4: ...For reference only Operators manual should be consulted and adhered to...
Страница 6: ...For reference only Operators manual should be consulted and adhered to...
Страница 12: ...For reference only Operators manual should be consulted and adhered to...
Страница 14: ...For reference only Operators manual should be consulted and adhered to...
Страница 22: ...For reference only Operators manual should be consulted and adhered to...
Страница 80: ...For reference only Operators manual should be consulted and adhered to...
Страница 82: ...For reference only Operators manual should be consulted and adhered to...
Страница 140: ...For reference only Operators manual should be consulted and adhered to...
Страница 206: ...For reference only Operators manual should be consulted and adhered to...