5.2.2.4 Assembly of right crawler carrier
The process of assembling right crawler carrier:
a) Confirm that left crawler carrier is in contact with the ground (see the figure 5-14). At this
time, the crane is inclined slightly, and the superstructure can slew freely.
b) Lift right crawler carrier from the low-loader, and assemble it onto the undercarriage
central section by use of mounting cylinder and main boom pivot section. If necessary, use
right horizontal cylinder to assemble crawler carrier.
c)
Adjust the height of support cylinder to allow left and right crawler carriers to contact the
ground. Extend right horizontal cylinder to working position.
Figure 5-14 Assembly of right crawler carrier
DANGER
When only one crawler carrier is attached on the crane, the operator must first make this
crawler carrier come into contact with the ground, and then slew the tail end of slewing
table above the crawler carrier. Otherwise, serious injury or property damage will occur.
For reference only.
Operators manual should be consulted and adhered to.
Содержание ZCC1100
Страница 2: ...For reference only Operators manual should be consulted and adhered to...
Страница 4: ...For reference only Operators manual should be consulted and adhered to...
Страница 6: ...For reference only Operators manual should be consulted and adhered to...
Страница 12: ...For reference only Operators manual should be consulted and adhered to...
Страница 14: ...For reference only Operators manual should be consulted and adhered to...
Страница 22: ...For reference only Operators manual should be consulted and adhered to...
Страница 80: ...For reference only Operators manual should be consulted and adhered to...
Страница 82: ...For reference only Operators manual should be consulted and adhered to...
Страница 140: ...For reference only Operators manual should be consulted and adhered to...
Страница 206: ...For reference only Operators manual should be consulted and adhered to...