
Operator’s Manual for Crawler Crane
Crane
Operation
4-61
4) Rope reeving for main boom with fixed jib
Rope reeving for main boom with fixed jib is shown in the figure 4-56.
Figure 4-56
Rope reeving for fixed jib
4.6.2
Derricking rope reeving
The reeving of derricking rope is shown in the Figure 4-57
–
Figure 4-58.
A
A
Figure 4-57
Reeving of derricking rope
Rope pulley on
A-frame
Hoisting
winch 2
Rope pulley
on fixed jib
head
For reference only.
Operators manual should be consulted and adhered to.
Содержание ZCC1100
Страница 2: ...For reference only Operators manual should be consulted and adhered to...
Страница 4: ...For reference only Operators manual should be consulted and adhered to...
Страница 6: ...For reference only Operators manual should be consulted and adhered to...
Страница 12: ...For reference only Operators manual should be consulted and adhered to...
Страница 14: ...For reference only Operators manual should be consulted and adhered to...
Страница 22: ...For reference only Operators manual should be consulted and adhered to...
Страница 80: ...For reference only Operators manual should be consulted and adhered to...
Страница 82: ...For reference only Operators manual should be consulted and adhered to...
Страница 140: ...For reference only Operators manual should be consulted and adhered to...
Страница 206: ...For reference only Operators manual should be consulted and adhered to...